My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5D, Adopt Trail Maintenance Guidelines
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
06-25-12-R
>
5D, Adopt Trail Maintenance Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:23:20 AM
Creation date
8/15/2012 1:25:51 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
resulting moisture related damage. Slurry seal treatments can be expected to last <br />approximately three to five years. <br />o Micro surface — Similar to slurry seals except they use a chemically controlled <br />curing process. Seals the pavement surface from moisture infiltration and the <br />resulting moisture related damage. The additional mix stability allows it to be <br />applied in thick layers, making it ideal for filling ruts, and correcting other <br />deformations. Micro surface treatments typically last more than seven years. <br />• Bituminous Overlay/Reclaiming — Once a bituminous trail has reached a point where <br />crack treatments and asphalt emulsions no longer provide a satisfactory surface for the <br />user, bituminous overlay or reclaiming and repaving will be utilized to renew the trail <br />surface. <br />ADOPTCD BY TH� CITY COiJNCIL OF THE CITY OF ARD�N HILLS THIS 25TH DAY OF JUNE, 2012. <br />
The URL can be used to link to this page
Your browser does not support the video tag.