My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5E, Quotes for Survey Work - 2013 PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
08-27-12-R
>
5E, Quotes for Survey Work - 2013 PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2012 11:07:55 AM
Creation date
8/22/2012 11:07:46 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE TWO <br /> After reviewing Johanna Marsh in the field and with our past experience in mapping similar projects we are <br /> recommending that this survey be done after the leaves fall. This would result in a lower cost and better quality <br /> map so therefore our proposal will be based accordingly: <br /> 1. Field delineate the wetlands, <br /> $1200.00 <br /> a. Wetland delineation report which will describe existing functions and values of the wetland(see <br /> attached), <br /> $1300.00 <br /> 2. Monument boundaries of Lot 3 (Johanna Marsh) and set additional points on lines bordering private <br /> property. Set steel fence posts by monuments to help perpetuate boundary lines, <br /> $ 800.00 <br /> 3. Obtain sufficient field elevations to prepare a 1 foot contour interval map. Locate wetland flags, <br /> utilities, tennis court and other significant features, <br /> $2000.00 <br /> 4. Obtain a title report on Lot 3 to determine if land was deeded for park purposes or just public use, <br /> $300.00 <br /> 5. Draft base map at a scale of 1"= 50', <br /> $1200.00 <br /> 56800.00 <br /> Any work outside the above scope of work will be billed at the following hourly rates: <br /> 1. Principal R.L.S. $120.00 <br /> 2. Project Manager R.L.S $104.00 <br /> 3. Survey Technician $68.00 <br /> 4. 1 person GPS field crew $120.00 <br /> 5. 1 person Robotic field crew $120.00 <br /> 6. 2 person Total Station crew $155.00 <br /> 7. Office Manager $50.00 <br /> No additional charge for A.T.V. use. <br /> Assumptions: <br /> • If additional work is requested beyond this scope of work and re-staking is required of any of the above <br /> items,work to be billed as an extra at current hourly rates. <br /> • E.G. Rud and Sons terms are net 30 days. <br /> Thank you for the opportunity to provide you with an estimate on this project. Please call me at 651-361-8200 <br /> with any additional questions. <br /> August 21,2012 <br /> Jason E.Rud;PLS#41578 Date <br /> Client Signature Date <br /> If this estimate is acceptable, please sign and fax back to E.G. Rud and Sons at 651-361-8701. <br />
The URL can be used to link to this page
Your browser does not support the video tag.