My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 2012
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2010-2019
>
2012
>
February 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2012 11:50:07 AM
Creation date
9/5/2012 11:50:06 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benchmarks: <br />November 28, 2011 <br />accounts to be billed on calendar quarters <br />the 2012 Budget (5-0) <br />- <br />rather than rolling billing quarters) (5-0) <br />ment at 1976 Glen Paul Avenue for accu <br />- <br />mulation of refuse and debris (5-0) <br />Approved Ordinance 2011-013 amending <br />- <br />chapter 15 of City the Erosion and Sedi <br />December 12, 2011 <br />- <br />ment Control (5-0) <br />- <br />rial Trail payment no. 7 in the amount of <br />December 19, 2011 <br />Approved a contract with Kimley Horn <br />$20,545 (5-0) <br />Approved the Assistant City Engineer <br />Inc., for Old Highway 10 bridge design at a <br />position and authorized the advertisement <br />cost not to exceed $69,000 (5-0) <br />Approved Ordinance 2011-010 adopting <br />) <br />the 2012 Fee Schedule for permits and <br />penalties enforceable by the City (5-0) <br />- <br />$3,096,994 1.8 percent increase for 2012 <br />Approved Ordinance 2011-015 regarding <br />(4-1, Holmes) <br />water, sewer, and surface water utilities <br />(property owners designated the respon <br />- <br />Approved the 2012-2016 Capital Improve <br />sible party; delinquent accounts certi <br />- <br />- <br />ment Plan (5-0) <br />Meagan Beekman and Pang Silseth are Employees of the Year <br />by Lois Rem <br />residents and local business owners with <br />Specialist assisting callers and visitors at <br />M <br />utility billing questions; for her efforts to <br />are Arden Hills Employees of the <br />the City Hall front counter. In July 2007 <br />streamline the time-consuming utility bill <br />she was promoted to Accounting Clerk. In <br />- <br />ing tasks; and transitioning from the Citys <br />Committee distributes nomination forms <br />her current position, Pangs responsibilities <br />old accounting system to the new program. <br />to all City staff members. The completed <br />include utility billing, cash receipting, and <br />Pang is regarded as a great source of insti <br />forms are reviewed by the Committee and <br />accounts payable. She is being recognized <br />- <br />tutional knowledge with over seven years <br />for her professionalism when assisting <br />- <br />of outstanding service. <br />tee. Typically there is only one employee <br />recognized, but this year the Committee <br />Council grants consent for Highway 96/10 project <br />decided that both Pang and Meagan were <br />equally deserving of recognition. <br />by Susan Cathey <br />he City Council granted Municipal The County and Minnesota Department <br />T <br />Meagan Beekman, City Planner, began <br />of Transportation re-evaluated 2008 <br />- <br />her career at the City of Arden Hills in <br />ect to improve the intersection of Highway and 2009 noise analyses for the south <br />- <br />2007. Meagan is being recognized for <br />96 and Highway 10 by a vote of 4-1 at west quadrant of the intersection to see <br />the December 12 meeting. In September, if a different size wall would meet the <br />involves working with commercial and <br />Municipal Consent was denied pendtwo criteria for federal or State Trunk <br />- <br />ing resolution of four concerns, whose Highway funding. Although the reason <br />- <br />of which proceed to construction and some <br />outcomes are: <br />- <br />which do not. In every case, she gives the <br />fectiveness continues to fail, at all three <br />wall heights analyzed, largely because <br />her professional training and experience to <br />for 2013, so it will occur after the wid <br />- <br />resolve problems as they arise. Meagan is <br />the staff liaison to the Planning Commis <br />- <br />in 2012.The fact that the proposed wall does not <br />sion and advises the Commission on all <br />meet both criteria does not mean the City <br />planning cases. She recently took respon <br />- <br />The height of the concrete barrier may not build it, only that a different <br />sibility for successfully revising the Citys <br />way of funding it needs to be used. <br />right-of-way ordinance and is working <br />inches, the maximum allowable. <br />with other staff and citizens to improve the <br />Since all four items were satisfactorily <br />Citys website. Meagans positive attitude, <br />addressed by the County, the Council <br />- <br />dedication, reliability, and professional <br />ment of the noise wall on the north side <br />knowledge make her a great asset to the <br />of Highway 96 at I-35W to facilitate Municipal Consent and rescinding the <br />City. <br />future wall extension, stopping short of <br />eminent domain. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.