My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
11-14-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 3:34:42 PM
Creation date
9/17/2012 2:42:01 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RS <br /> AGENDA ITEM U <br /> Thresher Square <br /> 700 Third Street South <br /> Minneapolis,MN 55415 <br /> Phone: (612)370-0700 <br /> Fax: (612)370-1378 <br /> To: Murtuza Siddiqui /Arden Hills File: 31809691 <br /> Finance Director <br /> Cc: Michelle Wolfe/Arden Hills <br /> Tom Moore/Arden Hills <br /> From: Gregory S. Brown <br /> Arden Hills City Engineer <br /> Date: November 8, 2005 <br /> Subject: Pay Estimate#4 <br /> 2005 Pavement Management Program <br /> Background <br /> The City of Arden Hills awarded Amt Construction Company,Inc. of Hugo,MN the 2005 <br /> Pavement Management Program on August 8, 2005 for a total contract amount of <br /> $1,375,247.66. <br /> Project Status <br /> The Contractor has completed all storm sewer installation along the frontage road as well as in <br /> the cul-de-sac. The ponds have been fully graded with only some fine grading and shaping left <br /> to complete. The bulk of the curb and gutter has been completed in the cul-de-sac area and in <br /> the connection to TH 51. A few areas that still need attention for curb and gutter include the <br /> median noses at TH 51 and small sections of curb adjacent to catch basins. <br /> Wear course has been placed on Dunlap Street,Northwoods Drive, and on approximately half of <br /> Grey Fox Road. The paving will be finalized after the curb and gutter and median construction <br /> is completed which should happen within the week. Landscaping and restoration items <br /> including topsoil placement and sod installation are 95% complete and again will be finalized <br /> once the curb and gutter placement is complete. <br /> Recommendation <br /> The Arden Hills City Engineer recommends the Council approve Pay Estimate#4 for Arnt <br /> Construction Company, Inc. of Hugo, MN in the amount of$338,891.85. <br />
The URL can be used to link to this page
Your browser does not support the video tag.