Laserfiche WebLink
Fourth Dimension provided a website (www.fauxpanels.com) that offers additional information <br /> about the proposed sign material, and all of the finish options that are available from their <br /> distributor. <br /> Discussion <br /> Contractor - <br /> Staff is seeking direction on how to proceed with this project. Staff recommends that the <br /> Council identify a preferred sign contractor for the installation of the first two gateway signs, <br /> with the possibility of extending that contract to include additional gateway signs if the City <br /> chooses. One benefit of using the same contractor for multple signs is that, while each sign can <br /> be unique to fit with its specific location, each sign can also have common elements that tie them <br /> together throughout the City. <br /> Design <br /> Once a contractor is selected for the first two signs, Staff can work with them to refine the <br /> desired sign design for both the corner of County Road E and Lexington Avenue, as well as the <br /> triangle parcel on County Road D and Lake Johanna Boulevard. Staff would then bring a refined <br /> design back to the Council for final approval prior to installation. It is anticipated that the sign <br /> on County Road E and Lexington would be installed prior to the opening of the Walgreen's in <br /> the early fall. <br /> Staff is seeking specific direction on the sign design and materials which can guide the selected <br /> sign contractor in refining the designs to meet the City's needs. Fourth Dimension provided <br /> sample materials, as well as a website which features the finishing options available. Staff will <br /> present a few options at the work session meeting for discussion. <br /> Budget <br /> As stated above, the estimated cost of the signs, with installation, was substantially lower than <br /> originally anticipated. The lower cost provides the City with additional options, such as using <br /> remaining budgeted funds on constructing additional signs in advance of the three year CIP time <br /> table. Staff is seeking direction from the Council on whether additional signs in 2012 would be <br /> desired. <br /> Requested Action <br /> Provide direction on a preferred sign contractor. Provide specific direction on preferred sign <br /> design and materials. Provide direction on use of budgeted funds. <br /> City ofArden Hills <br /> May 21, 2012, Work Session Meeting <br /> Page 3 of 4 <br />