My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5C, Sanitary Sewer Maintenance Policy
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
10-08-12-R
>
5C, Sanitary Sewer Maintenance Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2012 2:38:55 PM
Creation date
10/5/2012 2:35:52 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lt <br /> EN HILLS <br /> MEMORANDUM <br /> DATE: October 8, 2012 <br /> TO: Honorable Mayor and City Councilmembers <br /> Patrick Klaers, City Administrator <br /> FROM: Terry Maurer, Public Works Director <br /> SUBJECT: Sanitary Sewer Maintenance Policy <br /> Background <br /> Attached is the Sanitary Sewer Maintenance Policy that was discussed at the September <br /> 17, 2012 Work Session. This policy was prepared using the League of Minnesota Cities <br /> Insurance Trust (LMCIT) model as a guide. Staff has also reviewed the policy with <br /> Jackie Torgerson, Senior Loss Control Consultant from Berkley Risk Administrators <br /> Company, the League of Minnesota Cities Insurance Trust administrator and our <br /> insurance representative. Ms. Torgerson was specifically asked about the policy <br /> statement regarding televising the system every ten years and she indicated that is in line <br /> with the LMC recommendations. Having an adopted sewer policy was one of the <br /> recommendations of Ms. Torgerson when the City went through the LMCIT sanitary <br /> sewer assessment. <br /> Generally, the City's sanitary sewer system is comprised of: <br /> • 46 miles of collection system ranging in size from 8 inches to 21 inches <br /> • 1100 manholes <br /> • 14 lift stations <br /> • 4.4 miles of forcemain <br /> Of the 46 miles of collection system, the general breakdown of material type is: <br /> • 18.2 miles of PVC (plastic) pipe <br /> • 18.1 miles of VCP (clay) pipe <br /> • 5.3 miles of CIPP (lined) clay pipe <br /> • 4.4 miles of concrete pipe (larger lines) <br /> City Council Meeting <br /> R\Admin\Council\Agendas&Packet Information\2012\10-08-12 Reg Mtg\Packet\10-8-12Sanitary Sewer Maintenance <br /> Policy.doc <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.