My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5J, Lift Station #1 and #12 Improvements - Pay Request #4
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
10-29-12-R
>
5J, Lift Station #1 and #12 Improvements - Pay Request #4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2012 1:20:52 PM
Creation date
10/24/2012 3:28:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRICE QUOTATION <br /> MAGNEY CONSTRUCTION, INC. Watermain Conflict at Lift Station 1 <br /> 1401 Park Road <br /> Chanhassen, MN 55317 <br /> Phone (952)474-1674 <br /> Fax (952)474-1679 <br /> SEND TO <br /> Company name From <br /> Elfering and Associates Mark Magney <br /> Attention Date <br /> Kristie Elferin 7/11/2012 <br /> Urgent X❑ Please comment xO Please review XD For your information <br /> Total pages,including cover: 1 <br /> COMMENTS <br /> Re: Arden Hills Lift Station NO. 1 <br /> Kristie, <br /> We are offering the following price quotations for two options to deal with the existing 12" Watermain that <br /> is located between the Wet Well and Valve Vault at Lift Station 1: <br /> A. Lower the Forcemain elevation, between the wet well and the Valve Vault, from 900.5 to 899. <br /> This change involves core drilling three new holes in the wet well at this lower elevation. Plugging the existing <br /> pipe penetrations, adjusting the length of the vertical riser between the pumps and the 90 degree elbow, <br /> lower the bottom elevation of the Valve Vault by adding an 18" riser to the Valve MH and add itional-QXcavation <br /> to install the forcemain beneath the Watermain. _`11 <br /> TOTALLUMP SUM PRICE................................................................................. ......$3,200.00 r' <br /> B. Re-route the ermain by ping the el ion approximate 18". <br /> This chan volves expo ' about 20 ft atermain, cuttin pipe and installin degree el s <br /> to dire e pipe down a lower elev 'on, disinfection of pipe. <br /> TL LUMP S RICE.......�.......................... ..................., <br /> In addition to the cost, we are requesting a time extension of approximately one week for this change. The <br /> extent of the delay will be determined after the additional work is completed. <br /> Please review these two proposals and let us know if either one is acceptable. Feel free to contact me if <br /> you have any questions. <br /> Thank You, <br /> Mark Magney <br /> President Accepted By Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.