My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, Arden Village Discussion
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
11-13-12-WS
>
1A, Arden Village Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2012 11:27:45 AM
Creation date
11/9/2012 11:27:39 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The change in unit mix may also impact the footprint of the building slightly, though Staff <br /> anticipates that any footprint modifications would be minimal. SCI will present a site plan and <br /> any revisions to the footprint to the Council at the November 8 work session. <br /> All other aspects of the project would remain the same, including 1:1 underground parking, and <br /> exterior building finishes. The project also meets all of the standards for multi-family dwellings <br /> that the Council recently adopted. <br /> Approval Impacts <br /> As part of the PUD approval for this project, the City granted several flexibilities from the <br /> Zoning Code: <br /> • Comp plan amendment from Utility to High Density Residential <br /> • Zoning Code Amendment from 1-1 to R-4 <br /> • Density bonus from 12 units per acre to just under 20 units per acre <br /> • A reduction in the number of replacement caliper inches required from 557 to 210 <br /> It should be noted that the project was subject to park dedication and in lieu of paying cash park <br /> dedication, the City asked SCI to construct a trail segment that connected their development to <br /> the City's sidewalk system, to which SCI agreed. The anticipated cost of the trail segment <br /> exceeded the amount that would have been owed as a park dedication payment. <br /> The only flexibility that was granted as a direct result of the affordability component of the <br /> project was the tree replacement reduction. It may be appropriate to revisit this reduction as part <br /> of the discussion to convert the development from affordable to market rate. Staff has asked SCI <br /> to address this item at the meeting on Tuesday. <br /> Approval Process <br /> One of the conditions added to every land use approval is that the project must be constructed in <br /> accordance with the approved plans, and that any significant changes to these plans, as <br /> determined by the City Planner, shall require review and approval by the Planning Commission <br /> and City Council. This condition allows staff to approve minor modifications to plans, which <br /> are common during the construction process. <br /> While staff feels that the modifications proposed by SCI for the Arden Village project are minor <br /> in nature, due to the visibility and interest in this particular project, staff is bringing these <br /> revisions to the Council for review. If the Council determines that the proposed plans constitute <br /> minor modifications to the approved plans, Staff will proceed with drafting a development <br /> agreement amendment that includes the minor modifications and bring this item to Council at the <br /> City of Arden Hills <br /> City Council Work Session for November 13, 2012 <br /> P:IPlanningManning Cases12009(laserfiched)W-021 Arden Village PUD,Plat,Rezoning(APPROVED)12012 Development Agreement <br /> Amendmentlll-13-12-CC Work Session-Arden Village.doc Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.