Laserfiche WebLink
Project No. ESPOO8914P LOG OF BORING NO. B16 Sheet 1 of 1 <br /> CLIENT ARCHITECT/ENGINEER <br /> City of Arden Hills <br /> SITE PROJECT <br /> Arden Hills, Minnesota 2012 Arden Hills Pavement Rehabilitation <br /> Ridge Wood Dr SAMPLES TESTS <br /> 0 <br /> w <br /> 0 <br /> O ADDITIONAL <br /> U 6 � �j � O� a z v DATA/ <br /> O x in m w tom- p a� REMARKS <br /> O off. p>❑ a �O ru p Ea <br /> Surface Elev.: c� 0 o mz� z ?? 02 oa a? <br /> FILL,3 3/4"of bituminous pavement at FILL AS 1 AUGER 12 <br /> 0.4 the surface <br /> FILL, 19 T/4"of sand&grave! — <br /> aggregate base, brown,frozen <br /> 22 2 SS 24 <br /> 2-0----------------------- <br /> FILL,silty sand,gray to brown,moist <br /> 9 3 SS 24 <br /> 3.5 <br /> ORGANIC CLAY,black,moist(OL) {_ r P oL <br /> 4.0 <br /> SANDY LEAN CLAY with a trace of GLACIAL <br /> gravel,gray and brown mottled,moist, <br /> firm(CL) <br /> 5.0 5 <br /> End of Boring <br /> N <br /> ti <br /> F- <br /> D <br /> U <br /> m <br /> 2 <br /> Z <br /> a <br /> 0 <br /> J <br /> a' <br /> gw <br /> a <br /> w <br /> wH <br /> O <br /> a <br /> o: <br /> WATER LEVEL OBSERVATIONS element STARTED 1117/12 FINISHED 1/17/12 <br /> None materials technology DRILL co, Element DRILL RIG 367 <br /> 662 Cromwell Ave. <br /> ` St. Paul, MN 55114 DRILLER Dunleavy ASS'TDRILLER JR <br /> Telephone: 651-645-3601 <br /> LOGGED BY KSZ APPROVED MAS <br />