Laserfiche WebLink
built. It was also explained that RCWD rules would require a total area of water <br /> treatment that will mean a treatment area will need to be constructed before <br /> Johanna Marsh. There are only two areas that can be used; one of them <br /> requires trees to be removed and the other area would require the tennis court to <br /> be removed. <br /> Q: A few questions were asked about access during construction. <br /> A: It was explained that emergency vehicle access would be provided at all times <br /> and access to driveways would be provided each night. There will be times that <br /> construction activities will disrupt individual property access during the work day <br /> but the homeowner will be given notice. Finally, if concrete curb and gutter is <br /> included in the project there will be a few days after it is poured that it cannot be <br /> driven over so access to the driveways will be restricted. <br />