Laserfiche WebLink
�����`� y Watermain Sanitary <br /> t p• ���I System <br /> Sewer <br /> • Replace watermain on <br /> Ridgewood North block •Sanitary Sewer Lining <br /> and Edgewater Ave •Force main replacement <br /> end <br /> •Replace valves and <br /> Hydrants <br /> Storm Water / Water <br /> I' <br /> ualit Im rovements <br /> Storm ■ Storm sewer collection system replaced <br /> ■ Water Quality Improvements <br /> �,m : SeWBr —Raingardens <br /> \r I. �'� —Biofiltration Basins <br /> —Infiltration Trenches <br /> —Cooperation with Rice Creek Watershed <br /> •Storm Sewer Collection System M nholes, District <br /> Inlet&Outlet <br /> Catch Basin <br /> Storm Pipe <br /> •increase inlet capacity <br />