My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-12-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2012
>
11-28-12-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 12:22:27 AM
Creation date
11/30/2012 3:52:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building would be redone to accommodate the retail bays. <br /> The applicant is also proposing a number of site improvements. Included in the <br /> improvements is a complete reconstruction of the existing parking lot, inclusion of <br /> stormwater ponding, curb, gutter, and parking lot islands with landscaping, as well as <br /> additional landscaping throughout the site. The applicant is proposing additional parking <br /> stalls in front of the retail bays; however the bituminous drive aisle in front of the hotel <br /> portion of the building would be removed and landscaped. The center driveway access <br /> would be removed, and the two other access points would remain in their current locations. <br /> The applicant is also proposing to remove the front portico, which will increase the visibility <br /> from County Road E and update the look of the outside of the building. <br /> The applicant believes the target market for the apartments to be students; however, as a <br /> market rate apartment building,the landlord must rent to anyone that is approved through the <br /> rental application process. <br /> The applicant has submitted a letter outlining the reasons for the request (Attachment A), and <br /> a plan set(Attachment E). <br /> 2. Planned Unit Development (PUD) Process: <br /> The PUD process is a tool that provides additional flexibility for developments that an <br /> underlying zoning district would not otherwise allow. For example, a PUD may change the <br /> setbacks, lot coverage,parking requirements, signage, building height, building materials, <br /> landscaping requirements, etc. The process is meant to create a better development than the <br /> standard regulations may otherwise allow. The PUD process allows the City to negotiate <br /> certain aspects of the development; however, any conditions imposed on the PUD must have <br /> a rational basis related to the impacts of the development. While each PUD process is <br /> unique, it is a common process used by many cities. The PUD process cannot be used to <br /> permit uses that would not otherwise be permitted in the underlying zone. <br /> This application is for the reuse of a former hotel into a multiple-family dwelling building. <br /> The application is unique because the request is regarding the use of a building and site that <br /> are already developed. The typical evaluation as to whether or not the proposed plan meets <br /> the minimum requirements of the Zoning Code is more difficult given that there are certain <br /> aspects of the site that cannot reasonably be altered, such as the setbacks of the building. <br /> That being said there are certain reasonable improvements that can be required for the <br /> property given the nature of the PUD process. <br /> City of Arden Hills <br /> Planning Commission Special Meeting for November 28, 2012 <br /> P:Wlanning0anning Cases12012112-019-1201 County Road E-PUD MAster and Final PlanW-28-12-PC Report-1201 County Road E <br /> PUD.docx <br /> Page 3 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.