Laserfiche WebLink
CR E IMPROVEMENTS COST ESTIMATE <br /> ARDEN HILLS,MN <br /> CONNELLY STREET/BINGO HALL ACCESS <br /> BID ITEM UNIT QTY UNIT COST TOTAL COST <br /> REMOVE BITUMINOUS PAVEMENT SY 854 $2.83 $2,416 <br /> REMOVE CONCRETE MEDIAN SY 62 $4.92 $303 <br /> REMOVE CURB&GUTTER LF 245 $3.60 $882 <br /> REMOVE CONCRETE DRIVEWAY PAVEMENT SY 33 107 333 <br /> BITUMINOUS WEAR COURSE-2" SY 140 $70,00 9,788 <br /> BITUMINOUS NON-WEAR COURSEā€¢2" TON 140 $60.00 $8,389 <br /> BITUMINOUS TACK COAT GAL 58 $2.00 $116 <br /> 8"CONCRETE DRIVEWAY PAVEMENT SY 33 $50.00 $1,667 <br /> CONCRETE CURB AND GUTTER LF 449 $14.00 $6,286 <br /> TURF WORK L SUM I i 1 $10,000.00 $10,000 <br /> TRAFFIC CONTROL AND STAGING L SUM 1 1 $5,000.00 $5,000 <br /> SUBTOTAL $45,179 <br /> +15%CONTINGENCY $6,777 <br /> +2S%ENGINEERING $12,989 <br /> TOTAL $64,946 <br /> TCF CR E ACCESS AND PARKING IMPROVEMENTS <br /> BID ITEM UNIT QTY UNIT COST TOTAL COST <br /> REMOVE BITUMINOUS PAVEMENT SY 159 $2.83 $449 <br /> REMOVE CONCRETE DRIVEWAY PAVEMENT SY 73 $10.00 $733 <br /> REMOVE CONCRETE MEDIAN SY 43 $4.92 $212 <br /> REMOVE CURB&GUTTER LF 176 $3.60 $634 <br /> BITUMINOUS WEAR COURSE-2" SY 37 $70.00 $2,590 <br /> BITUMINOUS NON-WEAR COURSE-2" TON 37 $60.00 $2,220 <br /> BITUMINOUS TACK COAT GAL 31 $2.00 $61 <br /> CONCRETE CURB AND GUTTER LF 306 $14.00 $4,277 <br /> 4"SOLID LINE WHITE-EPDXY LF 234 $0.25 $59 <br /> TURF WORK L SUM 1 $4,000.00 $4,000 <br /> SUB TOTAL $15,234 <br /> +15%CONTINGENCY $2,266 <br /> +25%ENGINEERING $4,380 <br /> TOTAL $21,901 <br /> BOLTON MENK,INC. 12/5/2012 <br />