My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, B2 Guiding Plan - Implementation Report
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
12-10-12-WS
>
1A, B2 Guiding Plan - Implementation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 5:16:27 PM
Creation date
12/6/2012 5:08:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNTY RD E (6-2 DISTRICT) IMPLEMENTATION PLAN <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION.............................................................................................................................1 <br /> 2.0 BACKGROUND TRAFFIC CONDITIONS....................................................................................1 <br /> 3.0 CONCEPT DISCUSSION AND DEVELOPMENT........................................................................2 <br /> 3.1. FIRST CORRIDOR ADVISORY COMMITTEE MEETING(APRIL 11,2012)................2 <br /> 3.2. SECOND CORRIDOR ADVISORY COMMITTEE MEETING(JUNE 18,2012) ............2 <br /> 3.3. INDIVIDUAL BUSINESS OWNER MEETINGS ...............................................................4 <br /> 3.4. CITY COUNCIL WORK SESSION(JULY 25,2012).........................................................5 <br /> 3.5. THIRD CORRIDOR ADVISORY COMMITTEE MEETING(OCTOBER 8,2012).........6 <br /> 4.0 CONCLUSIONS...............................................................................................................................7 <br /> FIGURES <br /> (Please note that figures are assembled at the end of the text.) <br /> FIGURE 1 —PROJECT LOCATION <br /> FIGURE 2—TRAFFIC INFORMATION MAP <br /> FIGURE 3—FIVE LANE OPTION <br /> FIGURE 4—MEDIAN OPTION <br /> FIGURE 5—ROUNDABOUT OPTION <br /> FIGURE 6—PHASE I CONCEPT <br /> TABLES <br /> TABLE 1 —PARTICIPATING BUSINESSES............................................................................................4 <br /> TABLE 2—ESTIMATED PHASE I CONCEPT COSTS............................................................................7 <br /> APPENDIX <br /> APPENDIX A—CORRIDOR ADVISORY COMMITTEE ROSTER <br /> APPENDIX B—LANDSCAPE ARCHICTECTURE PRESENTATION <br /> APPENDIX C—DETAILED PHASE I CONCEPT COST ESTIMATE INFORMATION <br /> Prepared by:Bolton&Menk,Inc. <br /> County Rd E(B-2 District)Implementation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.