Laserfiche WebLink
COUNTY RD E (6-2 DISTRICT) IMPLEMENTATION PLAN <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION.............................................................................................................................1 <br /> 2.0 BACKGROUND TRAFFIC CONDITIONS....................................................................................1 <br /> 3.0 CONCEPT DISCUSSION AND DEVELOPMENT........................................................................2 <br /> 3.1. FIRST CORRIDOR ADVISORY COMMITTEE MEETING(APRIL 11,2012)................2 <br /> 3.2. SECOND CORRIDOR ADVISORY COMMITTEE MEETING(JUNE 18,2012) ............2 <br /> 3.3. INDIVIDUAL BUSINESS OWNER MEETINGS ...............................................................4 <br /> 3.4. CITY COUNCIL WORK SESSION(JULY 25,2012).........................................................5 <br /> 3.5. THIRD CORRIDOR ADVISORY COMMITTEE MEETING(OCTOBER 8,2012).........6 <br /> 4.0 CONCLUSIONS...............................................................................................................................7 <br /> FIGURES <br /> (Please note that figures are assembled at the end of the text.) <br /> FIGURE 1 —PROJECT LOCATION <br /> FIGURE 2—TRAFFIC INFORMATION MAP <br /> FIGURE 3—FIVE LANE OPTION <br /> FIGURE 4—MEDIAN OPTION <br /> FIGURE 5—ROUNDABOUT OPTION <br /> FIGURE 6—PHASE I CONCEPT <br /> TABLES <br /> TABLE 1 —PARTICIPATING BUSINESSES............................................................................................4 <br /> TABLE 2—ESTIMATED PHASE I CONCEPT COSTS............................................................................7 <br /> APPENDIX <br /> APPENDIX A—CORRIDOR ADVISORY COMMITTEE ROSTER <br /> APPENDIX B—LANDSCAPE ARCHICTECTURE PRESENTATION <br /> APPENDIX C—DETAILED PHASE I CONCEPT COST ESTIMATE INFORMATION <br /> Prepared by:Bolton&Menk,Inc. <br /> County Rd E(B-2 District)Implementation Plan <br />