Laserfiche WebLink
Meagan Beekman,AICP November 28,2012 <br /> City of Arden Hills Page 8 <br /> East Access Concept B(Figure 4) <br /> • Closes the existing full-access to County Road E and creates a right-in/right-out access to <br /> County Road E located approximately 175 feet east. <br /> o Require extension of the median along County Road E to restrict access. <br /> • Creates adequate space to accommodate up to a 9,000 square foot building footprint,which <br /> could be used as a strip-retail center or office complex. <br /> • Improves internal circulation and pedestrian connectivity while reducing the likelihood for <br /> queuing at site access locations. <br /> • Introduces the likelihood of U-Turn maneuvers occurring to accommodate vehicles destined <br /> to Lexington Avenue or to the east along County Road E. <br /> o These U-Turns are expected along westbound County Road E at the existing full-access. <br /> • There is sufficient roadway width to accommodate this U-Turn maneuver. <br /> • Approximately 500 vehicles per day are expected to make this U-Turn maneuver. <br /> • Depending on the land-use type,the parking supply may need to be modified. <br /> o Concept B provides slightly more parking than Concept A. <br /> It should be noted that both east concepts are expected to provide adequate operations, <br /> circulation,and parking.Further discussion with the developer,City,and County should occur to <br /> identify a preferred access concept to allow for future planning of Lot 2. <br /> POTENTIAL BUILDING TRIP GENERATION <br /> To determine if there are additional impacts associated with the potential development of Lot 2, <br /> trip generation estimates were developed based on the potential building footprints identified in <br /> Concepts A and B, respectively. Results of the trip generation estimates summarized in <br /> Table 2 indicate that the proposed restaurant land use is expected to generate more trips than the <br /> potential retail space. However, regardless of which access or building use is preferred, the <br /> additional trips for Lot 2 are not expected to create any significant capacity issues within the <br /> study area. It should be noted that if County Road E is expanded,development of Lot 2 would <br /> likely increase the need for larger type vehicles(delivery trucks)to use the existing east access, <br /> creating additional conflicts. <br /> Table 2 <br /> Potential Trip Generation-Lot 2 <br /> Land Use Type Weekday A.M. Weekday P.M. Daily <br /> Lan Code) Size Peak Hour Trips Peak Hour Trips Trips <br /> In Out In Out <br /> East Concept A Lot 2 <br /> - Restaurant(932) 5,625 SF 33 28 33 22 715 <br /> East Concept B(Lot 2) <br /> - Retail Space(820) 9,000 SF 6 3 17 16 384 <br /> Note:No multi-use,multi-modal,or pass-by reductions were assumed for these land uses. <br /> H:I Projects 179461 Report I7946_FormerHol idaylnnSite_OpsSummary_121128.doc <br />