My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, Accept B2 District Implementation Plan and Order B2 District Feasibility Study
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2012
>
12-17-12-Special
>
7B, Accept B2 District Implementation Plan and Order B2 District Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2012 4:29:53 PM
Creation date
12/13/2012 3:58:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br /> Staff has asked Bolton and Menk to prepare a scope of services and an estimated cost to <br /> complete the Feasibility Report. We have also asked Bolton and Menk to include two <br /> items that would not normally get much attention in the feasibility phase of a project. <br /> These two items are: detailed survey work (normally completed in the final design <br /> phase) so all property owners' questions can be answered about how specific <br /> improvements will affect their properties, and preliminary design of items that would <br /> normally be considered County improvements such as the double left turn lane from <br /> eastbound County Road E to northbound Lexington Avenue. Attached is the proposal <br /> from Bolton and Menk for completion of the Feasibility Report and the full topographic <br /> survey. The proposal includes an estimated 13 meetings with individual property owners <br /> who will be directly affected by some of the proposed improvements such as driveway <br /> interconnections. The total cost estimate for this work is $56,700 and the time frame for <br /> its completion is approximately 6 months. <br /> Council Action Requested <br /> The City Council is requested to take two actions. First, a motion to accept the County <br /> Road E (B-2 District) Implementation Plan and secondly to adopt Resolution 2012-054 <br /> Ordering the Feasibility Report for the B-2 District and authorizing staff to enter into a <br /> contract with Bolton and Menk for completion of the Feasibility Report. <br /> City Council Meeting <br /> P:\Admin\Council\Agendas&Packet Information\2012\12-17-12-Special\Packet\12-17-12 B-2Pl&Feasibilty.doc <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.