Laserfiche WebLink
II <br /> Staff has asked Bolton and Menk to prepare a scope of services and an estimated cost to <br /> complete the Feasibility Report. We have also asked Bolton and Menk to include two <br /> items that would not normally get much attention in the feasibility phase of a project. <br /> These two items are: detailed survey work (normally completed in the final design <br /> phase) so all property owners' questions can be answered about how specific <br /> improvements will affect their properties, and preliminary design of items that would <br /> normally be considered County improvements such as the double left turn lane from <br /> eastbound County Road E to northbound Lexington Avenue. Attached is the proposal <br /> from Bolton and Menk for completion of the Feasibility Report and the full topographic <br /> survey. The proposal includes an estimated 13 meetings with individual property owners <br /> who will be directly affected by some of the proposed improvements such as driveway <br /> interconnections. The total cost estimate for this work is $56,700 and the time frame for <br /> its completion is approximately 6 months. <br /> Council Action Requested <br /> The City Council is requested to take two actions. First, a motion to accept the County <br /> Road E (B-2 District) Implementation Plan and secondly to adopt Resolution 2012-054 <br /> Ordering the Feasibility Report for the B-2 District and authorizing staff to enter into a <br /> contract with Bolton and Menk for completion of the Feasibility Report. <br /> City Council Meeting <br /> P:\Admin\Council\Agendas&Packet Information\2012\12-17-12-Special\Packet\12-17-12 B-2Pl&Feasibilty.doc <br /> Page 2 of 2 <br />