Laserfiche WebLink
CA E IMPROVEMENTS COST ESTIMATE <br /> ARDEN HILLS,MN <br /> HOLIDAY INN AND ADJACENT PROPERTIES <br /> BID ITEM UNIT CITY UNIT COST TOTALCOST <br /> REMOVE BITUMINOUS PAVEMENT SY 1,766 $2.83 $4,998 <br /> REMOVE CURB&GUTTER LF 282 $3.60 $1,015 <br /> AGGREGATE BASE JCV)CLASS S-8" CY 304 $0.70 $213 <br /> GRANULAR BORROW-12" CY 457 $19.84 $9,060 <br /> COMMON EXCAVATION-24" CY 913 $10.62 $9,700 <br /> BITUMINOUS WEAR COURSE-2' TON 166 $70.00 $11,604 <br /> BITUMINOUS WEAR COURSE-2' TON 166 $60.00 $91946 <br /> BITUMINOUS TACK COAT GAL 137 $2.00 $274 <br /> CONCRETECU RB AND GUTTER LF 1,913 $14.00 $27,622 <br /> 8"CONCRETE DBIVEWAY PAVEMENT $Y 41 $50.00 $2,067 <br /> MOVE PRIVATE UTILITIES LSUM 1 $20,000.00 $20,000 <br /> TURF WORK I LSUM 1 $50,000.00 $10,000 <br /> TRAFFIC CONTROL AND STAGING LSUM 1 $5,000.00 $5,000 <br /> SUBTOTAL $113,499 <br /> +15%CONTINGENCY $16,725 <br /> +25%ENGINEERING $32,056 <br /> TOTAL 5160,261 <br /> TCF/NORTH PARK ACCESS CONNECTION <br /> BID ITEM UNIT QTY UNITCOST TOTALCOST <br /> PROPOSED IMPROVEMENTS LSUM 1 $20,000.00 $20,000 <br /> SUBTOTAL 520,000 <br /> +IS%CONTINGENCY $3,000 <br /> +25%ENGINEERING $5,750 <br /> TOTAL $28,750 <br /> STAPLES/BASKETS BY DESIGN CONNECTION <br /> BID ITEM UNIT CITY UNIT COST TOTAL COST <br /> PROPOSED IMPROVEMENTS LSUM 1 $20,000.00 $20,000 <br /> SUBTOTAL $20,000 <br /> +15%CONTINGENCY $3,000 <br /> ,25%ENGINEERING $5,750 <br /> TOTAL $28,750 <br /> ANCHOR BANK/WJ ANDERSON BACKAGE ROAD AND CA E MEDIAN EXTENSION <br /> BID ITEM UNIT I CITY UNIT COST TOTAL COST <br /> REMOVE BITUMINOUS PAVEMENT SY 301 $2.83 $852 <br /> REMOVE CURB&GUTTER LF 225 $3.60 $810 <br /> AGGREGATE BASE(CV)CLASS 5-8" CY 231 $030 $161 <br /> GRANULAR BORROW-12" CY 346 $19.84 $6,860 <br /> COMMON EXCAVATION-24" CY 692 $10.62 $7,344 <br /> BITUMINOUS WEAR COURSE-2" TON 126 $70.00 $8,786 <br /> BITUMINOUS NON-WEAR COURSE-2" TON 126 $60.00 $7,531 <br /> BITUMINOUS TACK COAT GAL 104 $2.00 $207 <br /> 8"CONCRETE DRIVEWAY PAVEMENT SY 25 $50.00 $1,272 <br /> CONCRETE MEDIAN SY 285 $27.05 $7,709 <br /> CONCRETE CURB AND GUTTER LF 1,299 $14.00 $18,186 <br /> 4"DOUBLE SOLID LINE YELLOW-EPDXY LF 305 $0.50 $153 <br /> CROSSWALK MARKING-EPDXY SF 486 $5.81 $2,824 <br /> TURF WORK LSUM 1 $4,000100 54,000 <br /> SUBTOTAL $66,6945 <br /> +IS%CONTINGENCY $10,005 <br /> +25%ENGINEERING $19,175 <br /> TOTAL $95$76 <br /> BOLTON MENK,INC. 12/5/2012 <br />