My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9B, Consultant Contract to Assist Engineering with Preparation of Plans and Specifications for the 2013 Pavement Management Program
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
01-14-13-R
>
9B, Consultant Contract to Assist Engineering with Preparation of Plans and Specifications for the 2013 Pavement Management Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2013 3:22:51 PM
Creation date
1/9/2013 3:22:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wa% k NOUNS 4� <br /> 1111.9 I!ullC <br /> January 4, 2013 <br /> John M. Anderson P.E. <br /> City of Arden Hills <br /> 1245 West Highway 96 <br /> Arden Hills, MN 55112 <br /> RE: 2013 Pavement Management Project— Design Phase <br /> Dear Mr. Anderson: <br /> It is our understanding that the City anticipates moving forward with design of the 2013 <br /> Pavement Management Project. Based on our assistance to the City in the preliminary <br /> phase providing topography, base drawings and wetland delineation, we are well versed <br /> in the neighborhood to provide a seamless extension of City Staff. Elfering &Associates <br /> will be providing staff time as needed to augment Assistant City Engineer John <br /> Anderson's efforts to prepare final plans and specifications. <br /> We appreciate this opportunity to submit a schedule of rates for staff that are available to <br /> you to assist with the project. Our 2013 rates, which have not been increased from 2012, <br /> are as follows. <br /> Design Engineer $100.00 <br /> Engineering Technician $ 65.00 <br /> As you know we assisted the city staff in producing plans and inspecting construction of <br /> the 2011 PMP. Our staff would be available to continue providing engineering support <br /> for the 2013 PMP. Elfering &Associates understand that the scope of the improvement <br /> is not determined at this point but is most likely going to include reconstruction or <br /> reclamation of the roadway, replacement of a potion of the watermain system, <br /> replacement of the sanitary sewer force main, a full reconstruction of the storm sewer <br /> collection system and addition of a storm treatment installation. Based on this <br /> understanding of the proposed improvements and our discussion with you we estimate <br /> our fees to fall within a range of$30,000 to $45,000 depending on the roadway <br /> improvement selected. Elfering &Associates would assist the City Staff through the <br /> design phase with Cadd drafting, storm sewer and storm treatment design, under your <br /> direction. We are prepared to assist you as soon as directed. Please feel free to <br /> contact us directly at (763) 780-0450. <br /> Sincerely, <br /> Elfering &Associates Accepted: <br /> Kristie Elfering, P.E. <br /> Principal City of Arden Hills Date <br /> 10062 Flanders Court N.E. Blaine,MN 55449—Phone:(763)780-0450—Fax:(763)780-0452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.