My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-13 Agenda Packet
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
02-25-13-R
>
02-25-13 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2013 5:54:18 PM
Creation date
2/22/2013 5:53:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTA <br />3.TheContractorshallassisttheCitybyalertingtheCityStaffofunlicensedhaulerswho <br />maybecomingintoArden <br />CURBSIDECOLLECTIONREQUIREMENTS <br />Thefollowingcollectionrequirementsareforcurbsiderecyclingservicesonlyanddopertainto <br />multifamilyrecycling <br />TheContractorshallcollectcurbsiderecyclingmaterials <br />3433.Pointof <br />Form <br />Allcurbsidecollectionservicewilloccuratthecurbside(i.e.,noalleycollectionsofrecyclables <br />areallowedforresidentswithcurbsidecollection <br />WalkUp <br />Aserviceforseniors,disabledand/orspecialneedsresidentswhorequestforspecialwherethe <br />driverwillwalkuptotheresident'sgaragedoor,stooporotherdesignatedspotcollectrecyclable <br />materialforloadingontothetruck.Thedriverthenreturnsthebins/cartsthesamelocation.TheCity <br />willcompilealistofsuchservicerequestsandpresenttocontractor30dayspriortothefirstcollection <br />forthoseresidentswhowillreceivetheuponstartofcontract.TheContractorwilltakecalls <br />directlyfromresidentswhorequestserviceandaddthemtothewalkupservicelistasneeded <br />throughoutthedurationof <br />Form <br />IftheContractordeterminesthatthecollectionofrecyclableswillnotbecompletedbyp.m.onthe <br />Form <br />scheduledcollectionday,theContractorshallnotifytheCityby4:00p.m.samedayandrequestan <br />extensionofthecollectionhours.TheContractorshallinformCityoftheareasnotcompleted,the <br />reasonforandtheexpectedtimecompletion.IftheCity's <br />contactpersoncannotbereached,ContractorwillrequesttheCity <br />3635.for <br />Form <br />IfContractordeterminesthataresidenthassetoutnontargetedmaterials,thedriverusethe <br />following <br />1.Contractorshallleavethenontargetedmaterialsintheresident'srecyclingbinand <br />leavean"educationtag"indicatingacceptablematerialsandpropermethodof <br />2.ThedrivershallrecordtheaddressandtheContractorshallreporttheaddresstheCitywithin <br />themonthly <br />3736.NewMaterialstobeAddedin <br />Form <br />TheCityandtheContractorhaveagreedtoaddadditionalplastics#3#1,#2,(nonbottle)aswell <br />Form <br />as#4,#5and#7plastics.byJuly1,2014.threenewmaterialstothecollectionprogram: <br />Form <br />pop/beerboxesand <br />Form <br />Thepop/beerboxesshallbeaddedtothepaperstream.Theseitemsshouldbeflattenedplacedbythe <br />Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.