My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-13 Agenda Packet
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
02-25-13-R
>
02-25-13 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2013 5:54:18 PM
Creation date
2/22/2013 5:53:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTB <br />toProperty <br />TheContractorshalltakeallnecessaryprecautionstoprotectpublicandprivateExceptfor <br />publicproperty,including, <br />reasonablewearandtear,theContractorshallrepairorreplaceanyprivate <br />butnotlimitedtosod,mailboxes,orrecyclingbins,whichdamagedbytheContractor.Suchproperty <br />damageshallbeaddressedforrepairreplacement,atnochargetothepropertyowner,withinforty <br />eight(48)hourswithpropertythesameorequivalentvalueatthetimeofthe <br />IftheContractorfailstoaddresstherepairorreplacedamagedpropertywithineight(48)hours, <br />theCitymay,butshallnotbeobligatedto,repairorreplacesuchproperty,andtheContractor <br />shallfullyreimbursetheCityforanyofitsreasonablyexpenses.TheContractorshallreimburse <br />theCityforanysuchexpenseswithintendaysofreceiptoftheCity's <br />TheContractorshallconformtothefollowingprovisionswhencollectingrecyclablesin <br />1.TheContractorshallstructureroutessothatlighterloadedtruckstravelonstreetswith <br />poorerconstruction.TheCityshallprovideroadconditiontothe <br />2.TheContractorshallbegintheirrouteswithassmallavolumeofrecyclablestheirtrucksas <br />3.TheContractorshallassisttheCitybyalertingtheCityStaffofunlicensedhaulerswho <br />maybecomingintoArden <br />CURBSIDECOLLECTIONREQUIREMENTS <br />Thefollowingcollectionrequirementsareforcurbsiderecyclingservicesonlyanddopertainto <br />multifamilyrecycling <br />TheContractorshallcollectcurbsiderecyclingmaterials <br />33.Pointof <br />Allcurbsidecollectionservicewilloccuratthecurbside(i.e.,noalleycollectionsofrecyclables <br />areallowedforresidentswithcurbsidecollection <br />WalkUp <br />Aserviceforseniors,disabledand/orspecialneedsresidentswhorequestforspecialwherethe <br />driverwillwalkuptotheresident'sgaragedoor,stooporotherdesignatedspotcollectrecyclable <br />materialforloadingontothetruck.Thedriverthenreturnsthebins/cartsthesamelocation.TheCity <br />willcompilealistofsuchservicerequestsandpresenttocontractor30dayspriortothefirstcollection <br />forthoseresidentswhowillreceivetheuponstartofcontract.TheContractorwilltakecalls <br />directlyfromresidentswhorequestserviceandaddthemtothewalkupservicelistasneeded <br />throughoutthedurationof <br />
The URL can be used to link to this page
Your browser does not support the video tag.