My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-13 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2013
>
04-16-13 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2013 10:32:55 AM
Creation date
4/11/2013 10:32:49 AM
Metadata
Fields
Template:
General
Document
4-16-13 PTRC Packet
General - Type
4-16-13 PTRC Packet
Category
4-16-13 PTRC Packet
Date
4/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks, Trails & Recreation Committee Meeting MinutesFebruary 26, 2013 <br />Page 4 <br />Council Liaison Holmes mentionedthat the microbrewery is still planning on going in at <br />1160 Red Fox Road. <br />Ms. Holmes informed that signs have been erected for the East Street Flats which was the <br />old HolidayInn site.They will have studio and 1-4 bedroom apartmentsand the retailer <br />that will be going in there is Now Bikes.Now Bikes is currently located in Shannon <br />Square but they feel they willhave more visibility at the East Street Flats location. She <br />mentioned the City is still trying to find something for the Carroll’s Furniture building. <br />Ms. Holmes stated that Hwy 10 and 96 will beclosing in May.Construction work will <br />start March 25 or 26,the streets willclose in May,andin August constructionwill be <br />complete enough so vehicles can travel west on Hwy 96 and turn up 10.The entire <br />construction will be completed by mid-November. <br />Ms. Holmes mentioned that the triangle parcel by PresbyterianHomes has finally been <br />cleaned up and the City is now in the process of determing what they are going to do with <br />that parceland will be placing agateway sign at the location. <br />Ms. Holmes informed that in lieu of “Celebrating Arden Hills”Council is looking at <br />having an ice cream socialin conjunction with the opening of Valentine Park at the end <br />of June. The event may include music and some other activities. <br />B.Public Works/Parks & Recreation Report <br />Parks and Recreation Manager Olson informed that the ice rinks officially closed on <br />Sunday, February 24,andthat they were actually open a week longer than scheduled. <br />Therinks will still be available for use, but the City will not be maintaining them. Ms. <br />Olson indicated she will bring rink use statistics to the next meeting. <br />Ms. Olson explained that with the new website there is an Agenda Center which allows <br />staff to do the agendas electronically. Ms. Olson indicated that if anyone prefers not to <br />receive the paper version of the packetto let her know. She informed that she will <br />continue sending out an e-mail with the linkto the packet. <br />Ms. Olsonmentioned that she has provided a year end recreation report and that the <br />programs highlighted in yellow are those that are in joint cooperation with Shoreview or <br />another city. The statistics show enrollmentwas up from the previous year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.