My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-17-13-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
06-17-13-WS
>
06-17-13-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2013 6:11:52 PM
Creation date
6/13/2013 6:11:42 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: June 12, 2013 <br /> <br />TO: Patrick Klaers, City Administrator <br /> <br />FROM: Terry Maurer, Public Works Director <br /> <br />SUBJECT: Round Lake Road West Improvements <br /> <br /> <br /> <br />As you requested, this memo is intended to provide more detail on the proposed improvements <br />we would suggest be included in a Round Lake Road West street and utility project. First, the <br />area of the proposed improvement is from the south end of the short piece of urban street that has <br />already been reconstructed, near the Holiday gas station at the north end to Gateway Boulevard <br />at the south end. This is a total length of approximately 3,000 feet. The proposed sanitary sewer <br />improvements go outside this area at the north end. <br /> <br /> <br />1.Street Improvement <br /> <br /> <br />The proposed street improvement will provide a 10 ton design urban roadway 48 to 52 feet in <br />width. The street section would be barrier concrete curb and gutter similar to the north end <br />near Hwy 96. There would be an 8 foot wide concrete sidewalk along the entire east side. <br />The current cost estimate does not include lighting or landscaping such as boulevard trees. <br />The street design would meet all Municipal State Aid (MSA) requirements as this street is on <br /> <br /> <br /> <br />2.Storm Drainage Improvement <br /> <br />With the street being reconstructed as an urban section there would need to be a pipe <br />drainage system placed under the street. This system would be designed according to MSA <br />standards. Rice Creek Watershed District will require a storm water pond to treat the runoff <br />collected in the pipe system. It is likely that property would have to be acquired to construct <br />this pond somewhere near the south end of Round Lake Road West. Monies have been <br />included in the estimate for land acquisition for the storm water treatment pond. <br />13 <br />Page of <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.