My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December 2012
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2010-2019
>
2012
>
December 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2013 8:53:36 AM
Creation date
7/10/2013 8:53:35 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Benchmarks: <br />a review of recent City Council action <br />October 29, 2012 <br />" " <br />vacating an unused portion of a trail <br />" <br />nomic Development Commission <br />(5-0) <br />(5-0) <br />" " <br />" <br />City-wide moratorium on multi-family (5-0) <br />" <br />connections (5-0) <br />" cies for the committees, commissions, <br />" <br />a conditional use permit allowing a and boards (5-0) <br />agement policy (5-0) <br />microdistillery and microbrewery with " <br />" <br />partment for the Citys share of capital <br />November 12, 2012 <br />two new computers, a laser printer, <br />" <br />neighborhood east of Northwestern <br />College (5-0) <br />" <br />ing in two councilmember seats going <br /> <br />(5-0) <br />by Brenda Holden <br />T <br />inspections of <br />he City sewer system: most homeown- <br />ers dont give it much thoughtunless <br />These inspect- <br />" The second is composed of the plastic <br />ions allow staff <br />city sewer system is complex and requires <br />mains and lined clay mains that need <br />to see if there <br />attention and maintenance to work prop- <br />less frequent cleaning of every 4 to 6 <br />are any breaks <br />or problems <br />" Finally, the third category includes <br />the larger mains which, due to heavier <br />completed major <br />improvements to two <br />Generally, the Citys sanitary sewer system <br />is comprised of: <br />lift stations. <br />" 1,100 manholes <br />Arden Hills welcomes Ulteig Engineers <br />" 14 lift stations <br />" <br />pipe from lift station to collector <br />system) <br />" 46 miles of collection system pipes <br />inches <br />Of the 46 miles of collection pipes, the <br />general breakdown of material type is: <br />" <br />" <br />" <br />" <br />lines) <br />truth of the matter is that our real investment is within the pe <br />To prevent backups and extend the life of <br />and experienced professionals who make Ulteig what it is, Miche <br />the system, the Citys maintenance policy <br />divides the collection system into three <br />" <br />mains which are most susceptible to <br />root intrusion and, therefore, need <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.