My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-6-13-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2013
>
03-6-13-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:17:11 PM
Creation date
7/10/2013 9:07:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTA <br />14.StormwaterFacilitySystemReviewandMapping <br />a.ProjectLead:AssistantCityEngineer <br />b.TheCityhasasystemofstormwaterfacilitiesincludingoutflowpipesandponds.The <br />Citydoesnothaveanefficientprocessinplacetotrackmaintenanceandmaintenance <br />schedulesofthesystem.Theprojectwouldincludefieldinspectionsofstormwater <br />facilities,creatingasystemtoidentify,rank,andclassifyeachfacility,andlocatingeach <br />facilitywiththe/z·äxhandheldGPSdevice,andmappingthesystem.TheCityalso <br />requiresaworkflowplanforregularmaintenanceofthesystem. <br />c.WhattypesofstormwaterfacilitiesdoestheCityhavewithinitssystem?Howarethese <br />facilitiesbestclassified,identified,andranked?Whatmaintenancescheduleisrequired <br />tokeepthesystemfunctional? <br />d.Deliverable:Completionofinfieldinspectionsofstormwatersystem,GPSlocatesand <br />thecreationofaGIStabletoidentifyandrankeachfacility,creationofasystemwide <br />map,recommendationsforworkflowschedulestomaintainthesystem. <br />e.SustainabilityImpact:Improvedwaterquality,efficientuseofCityresourcestomaintain <br />stormwatersystem. <br />f.PublicWorksDepartment <br />15.WorkflowSolutiontoMappingSanitarySewerInspections <br />a.ProjectLead:AssistantCityEngineer <br />b.TheCitycurrentlyhasaworkflowproblemintheareaofstormsewerinspections.The <br />Cityhasascheduleforsewerinspectionsthataretrackedusingapapermapand <br />highlighters.Thesystemisnotefficientforgatheringrealtimeinformationonproject <br />progress.TheCityhasuniqueidentificationsforeachsegmentofsewerlinethatis <br />alreadypartofaGISshapefile.TheCityneedsaworkflowsolutiontoallowinspectors <br />inthefieldtoenterinformationaboutsanitarysewerinspectionsdirectlyintoour <br />electronicsystem.TheCityhopesthatthissolutioncaneventuallybeexpandedto <br />includeotherinfieldtrackingofwork,suchashydrantflushes,sewercleaning, <br />watermainbreaks,watermeterinstallations,etc. <br />c.Whatareothercommunitiesdoingtoallowinfieldinformationtobeenteredintoan <br />electronicGISsystem?Whatarepossiblesolutionstothe/z·äxworkflowproblem? <br />Whatsolutionisthemostuserfriendlyintermsofeaseofuseforthepublicworks <br />employees? <br />d.Deliverable:Anapplicationthatallowspublicworkscrewstoentersanitarysewer <br />inspectionsdirectlyfromtheirtabletsintothe/z·äxGISsystem. <br />e.SustainabilityImpact:EfficientuseofCityresourcestomaintainsanitarysewerlines. <br />f.PublicWorksDepartment <br />16.StormwaterManagementModelingontheTCAAPSite <br />a.ProjectLead:PublicWorksDirector <br />b.TheCityisworkingwithaconsultantteamtocompleteaTCAAPmasterplan.A <br />componentoftheplanwillbeidentifyingregionalstormwatersolutionsforthe <br />stormwatermanagementthatwillberequiredonthesite.TheCitywouldlikethe <br />studentprojectteamtoworkwiththeconsultantteamtomodelthestormwaterrun <br />offthatwillbegeneratedonsitebasedonlanduseassumptions,analyzestormwater <br />ResilientCommunitiesProject‘ProposedProjectList‘ArdenHills‘2/15/2013Page 6 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.