My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-13-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2013
>
06-19-13-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:17:11 PM
Creation date
7/10/2013 9:18:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMORANDUM <br /> <br />DATE: June 6, 2013 <br /> <br />TO:Jill Hutmacher, Community Development Director <br /> <br /> <br />FROM: John M. Anderson, Assistant City Engineer <br /> <br /> <br />SUBJECT:Lexington Station plan review <br /> <br /> PW-13-0101 <br /> <br /> <br />I have reviewed the Preliminary plans for the Lexington Station site redevelopment. The plans <br />were prepared by Hoefler Architects LLC and are dated 5/28/13. The plan set contains 24 sheets. <br />The following are my comments: <br /> <br /> <br />1.An easement along Red Fox road will be needed for the public sidewalk proposed on <br />the south side of Red Fox Road. This sidewalk needs to be located to allow for future <br />construction of a right turn lane on Red Fox Road eastbound. Plan coordination is an <br />issue here as different plans show the sidewalk located differently. The plan dated 5- <br />28-13 and numbered C2.1 should be used for location of this sidewalk. The easement <br />should be shown on the preliminary plat. <br /> <br /> <br />2.A long term maintenance plan of the storm treatment system needs to be included for <br />review. <br /> <br /> <br />3.The parking lot circulation is a concern in the area where the drive thru lane meets <br />with the entrance off of Red Fox Road. At times, stacking of right turns exiting the <br />site on to Red Fox Road eastbound will block traffic leaving the phase one site drive <br />thru <br /> <br /> <br />4.The watermain along Lexington has had a history of breaks and an area 15 feet wide <br />needs to be kept clear of improvements that would limit the C <br />this watermain. <br /> <br /> <br />5.The owner is responsible to obtain all permits for construction including but not <br />limited to Rice Creek Watershed District, MPCA NPDES constriction permit, City of <br />Arden Hills Grading and Erosion Control permit. <br /> <br /> <br />6.Note 5 on the utility plan indicates storm sewer within 10 feet of the building needs <br />to meet plumbing code. The RCP pipe material shown on the plan in the area of the <br />NE corner of the Phase one building does not. <br /> <br /> <br />7.Sidewalk pedestrian ramp construction at Lexington and RedFox will need to be <br />coordinated with the project the City of Shoreview is constructing. <br /> <br />. P:\PR&PW\Numbered Projects\PW-13-0101 Lexington Station\06 plan review\6-5-13 plan review.doc <br /> <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.