Laserfiche WebLink
PTRC/City Council Joint Work Session <br />2013 Proposed Work Plan <br /> <br />1. TRAIL DEVELOPMENT <br />Priority Listing <br />Proposed trails listed are in no particular order within each ca <br />Proposed trails can move up in categories based on opportunities <br /> <br />Reviewed by PTRC annually <br />County Road E and Old Highway 10/Snelling -highest priority <br />Safety Concerns <br />County Road E bridge is due for replacement in 2015. The conne <br />trail from the bridge to Tony Schmidt Park should be considered <br />construction at that time. <br />The entire Old Highway 10/Snelling corridor is estimated to cost over 2 <br />million dollars. Working to build this corridor in segments m <br />strong option. As funding becomes available, connections can <br />project by project. <br /> <br /> <br />