Laserfiche WebLink
l. Wall Sections Phase One (A4.2) dated 4/30/2013, as revised on <br />6/28/2013 <br /> <br />m. Wall Sections Phase One (A4.3) dated 4/30/2013, as revised on <br />6/28/2013 <br /> <br />n. Schedules Phase One dated 4/30/2013, as revised on 6/28/2013 <br /> <br />o. Site Plan Photometrics dated 3/25/2013 <br /> <br />p. Exterior Building Lighting dated 4/30/2013, as revised on 5/6/2013 <br /> <br />q. Site Plan (C2.0) dated 5/28/13 <br /> <br />r. Site Plan (C2.1) dated 5/15/13, as revised on 6/5/2013 <br /> <br />s. Grading and Erosion Control Plan dated 5/15/2013, as revised on <br />6/5/2013 <br /> <br />t. Utility Plan dated 5/15/2013, as revised on 6/5/2013 <br /> <br />u. Details (C5.0) dated 5/15/2013, as revised on 6/5/2013 <br /> <br />v. Details (C5.1) dated 5/15/2013, as revised on 6/5/2013 <br /> <br />w. Details (C5.2) dated 5/15/2013, as revised on 6/5/2013 <br /> <br />2. Preliminary Plat of Roberts Addition to Arden Hills dated 5/6/2013 <br /> <br /> <br />3. Materials Board as presented on 7/8/2013 identifying the following <br />Materials and color pallet: <br /> <br /> <br />a.McNear Sandmold Series Stratford Modular Brick <br /> <br /> <br />4.Written Statement consisting of pages 1-2 dated 6/3/2013 <br />C. Subject to the conditions and modifications contained herein, the Redevelopment <br />Plan Documents represent the nature, scope and configuration of the Redevelopment Project <br />which the Developer is requesting the City to approve. <br />D. The PUD-Master Plan and the Redevelopment Plan Documents indicate that the <br />Property will be redeveloped in multiple phases: <br />168952 <br />