Laserfiche WebLink
ECR-WSS <br />PRST STD <br />U.S. Postage Paid <br />Twin Cities, MN <br />Permit #1962 <br />Arden Hills, MN <br /> 55112-5734 <br />. <br />I <br /> <br />Meet our new City Planner <br />n <br />Valentine Park reopens <br />s <br />Postal Customer <br />i <br /> Lexington Station approved <br />d <br />Green tips for back-to-school <br />e <br />Notes from the City Council <br />C leanup at TCAAP has been <br />Second, there are public involvement <br />underway for several months thousands of questions and ideas to <br />process meetings that are being held <br />now. Many of the buildings on consider. One thing I have learned <br />the south side of TCAAP have been recently is that Gen X and Gen Y may <br />meetings are with our development <br />removed. With the closure of Highway <br />consultants, Kimley Horn. You can <br />10 going north from Highway 96 important to them. It is important that <br />get a schedule of these meetings from <br />and only partially open going south we hear from all perspectives. <br />Arden Hills Notes or the City website. <br />from I-35W, most people don’t have <br />I encourage you to attend both <br />an opportunity to see how much Development takes time <br />meetings if possible. <br />It will take time to develop a master <br />on the southern section of TCAAP plan for TCAAP. I anticipate that <br />Imagine the possibilities <br />and as such, the buildings along a master plan for TCAPP will take <br />I-35W remain to be removed. By late until mid-2014. Currently we are just <br />meeting, parks and trails, housing, <br />November most of the buildings will starting the planning process and <br />transportation and overall design were <br />be gone, and there will be additional decisions have not been made. <br />big topics. Should we have a couple <br />foundation removal and soil To fully build out a 427 acre parcel <br />large parks, or smaller neighborhood <br />remediation work through 2014.could take 10-15 years. Together we <br />parks? Should we have sidewalks and <br />need to envision and document a <br />trails? Should we have street lights on <br />We need your input master plan design and the values <br />each corner? Just what percentage of <br />that drive it. Yet we also must have <br />business and housing should there <br />and as a region is to determine just <br />be? When it comes to housing what <br />or other conditions warrant a slight <br />types should be built: single family, <br />where we need your input. Gathering <br />condos, row houses, twin homes, <br />everyone’s ideas is the surest method <br />town houses, or senior housing, and <br />I hope you can make it to one of the <br />what percentages of each should be <br />meetings. I look forward to meeting <br />planned? What building materials <br />you can attend to provide your ideas. <br />and look should we design for? What <br />you. <br />First, at our Council meetings on <br />setbacks from the road should homes <br />the second Monday of each month, <br />have? Should we design to energy <br />I have placed a public hearing on <br />the agenda for anyone wanting to <br />degree and at what cost? Should high- <br />David Grant, Mayor <br />provide comment about what should <br />speed internet access be provided? <br />be built on TCAAP. I encourage you <br />What should the landscaping <br />standards be and look like? Should <br />public hearings should continue until <br />there be a neighborhood design <br />completion of the master plan. <br />similar to what we have currently? <br />