My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-13-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2013
>
08-26-13-R
>
08-26-13-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:30:25 AM
Creation date
8/26/2013 1:15:09 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM ORIGINAL CONTRACT THIS PERIOD TOTAL TO DATE <br /> Np, ITEM DESCRIPTION UNIT QTY. UNIT PRICE (STY. TOTAL P�IiCE CITY. TOTAL PRICE <br /> 1,23 0QNCRETE CURB&GUTTER,SPECIAL LF 318.00 S 20.51 346.m $ 7.141.37 346.50 $ 7.141.37; <br /> 124 TRAFFIC CONTROL � LS �1.00 $ 3,747.25 0.00 $ 0.50 S 1,R73.63 <br /> 1.25 SOD SY 3.200.00 $ 3.48 0.00 $ 0.00 $ <br /> 1,26 CLEAT _^ TREE 21.00 $ 294.43 OAO is 35.00 $ 1 C,3G5.05 <br /> 1.27 GRUB TREE 19.00 $ 53-53 0.00 $ 33.01) $ <br /> 1.2E CLEAfl SF 1.300.00 S 1-02 0.00 1$ 959.30 $ 976.49 <br /> 1.29 GRUB SF 1,300.00 $ 0.27 0.00 I$ - 95930 g� 259.01 <br /> 1.30 SALVAGE AND REINSTALL.PAVER WALK SF 20.00 $ 24.46 0.00 $ - 0.00 $ - <br /> 1.31 REMOVE WOOD RETAItJIr,.'G WALL LF 86.00 $ 0.65 79.00 $_ 830.70 -._ 78.00 $ 830.7G <br /> 1.32 RELOCATE MAILBOX I-A 3.00 $ 176.66 0.U0 $ 000 $ - <br /> i <br /> g 189,460.32 $ 258,312.72 <br /> `SCHEDULE 2.0-DRAINAGE IMPROVEMENTS <br /> 2.01 IRFMOVE STORM STRUCTURE EACH 6,00 389.58 4.00 1 $1,553.32 6.00 S 2,337 48 <br /> 2.02 REMOVE FLARED END SECTION EACH 1.00 S 139.14 G.OG $0.00 1.00 $ 139.14 <br /> 2.03 RErv14VE STORM SEWER PIPE LF 252.00 IS 6.68 107.00 $714.76 272.00 S 1.816,96 <br /> 2.04 ABANDON STORIJ SEWER PIPE LF 440.00 S 2.23 434.00 $967.82 434.00 $ 967,82 <br /> 2.05 FINAL ADJUST CASTING,STORM EAGH 2.w $ 519.26 0.00 $0.00 0.00 S <br /> 2.06 SALVAGE AND REPLACE RECLAIMED AGGREGATE CY 600.00 S 7.09 136.00 $964.24 849.00 $ _ 6,019-41 <br /> 2.07 12-HDPE STORM PIPE Lf 100.00 S 23 37 40.00 1 S934.80 100.00 $ 2.337.00 <br /> 2.08 15'HDPE STORM PIPE I LF 757.00 $ 25.60 605.00 $15,486.00 761 00 $ 19,431,64 <br /> 2.09 18'HDPE STORM PIPE LF 773.00 $ 30.05 489-00 $14,694.45 776.00 $ 23,318.80 <br /> 2.10 �211"CLAP PIPE APRON Yd/0 TRASHGUARD EACH 2M) $ 279.39 0.00 _ S0.00 0,00 $ <br /> 2.t-I nANOOM PIPRAP,CLASS Ill,GRANITE CY 36.00 $ 100.18 0.00 $0.00 0.00 $ <br /> 2.12 CONSTRUCT CATCH BASIN TYPE B EACH 6.00 $ 2,051-43 3.00 $6,154.29 5.00 $ 10,257.15 <br /> i <br /> 2.13 YQNSTRUCT MANHOLE TYPE B EACH 14.00 $ 2.619.11 11.00 $28.610.21 14.00 $ 36,667.54 <br /> 2.14 RAINWATER GARDEN LS 1,00 $ 17,054.48 1100 $17054.40 -1,00 $ 17,054AS <br /> 2.15, iMULCH MATERIAL TYPE SPECIAL CY 40.00 $ 176.6,6 40.00 $7,066.40 40.0E $ 7,066.40 <br /> 2,16 COMPOST,GRADE 2 SY 255.00 $ 16.05! 333.00 $5,347.98 333jM $ 5,347.98 ' <br /> 3 <br /> 2 17 INSTALL ROCK RETMWING WALL SF 555.00 3 _ 18.74 583.00 I -g10,925.42 583.00 $_� 10.925,42 <br /> 2.18 1 14'PERFORATED TP PIPE DF1AIN W/SOCK LF 519.00 $ 7.871 534.00 $4,202.58 534.00 $ 4 202 58 <br /> z <br /> i <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.