My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-11-WS Draft Minutes
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
11-14-11-R
>
10-10-11-WS Draft Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2013 5:35:13 PM
Creation date
10/28/2013 5:35:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> EN HILLS <br /> Approved: <br /> CITY OF ARDEN HILLS,MINNESOTA <br /> CITY COUNCIL WORK SESSION MEETING <br /> OCTOBER 10,2011 <br /> 8:00 P.M. -ARDEN HILLS CITY COUNCIL CHAMBERS <br /> CALL TO ORDER/ROLL CALL <br /> Pursuant to due call and notice thereof, Mayor Grant called to order the City Council <br /> Work Session meeting at 8:00 p.m. <br /> Present: Mayor David Grant; Councilmembers Brenda Holden, Fran Holmes,Nick <br /> Tamble and Ed Werner. <br /> Absent: None <br /> Also present: City Administrator Patrick Klaers; Public Works Director Terry Maurer; <br /> Parks & Recreation Manager Michelle Olson; City Attorney Jerry Filla; and Deputy Clerk <br /> Rebecca Brazys <br /> 1. APPROVAL OF AGENDA <br /> MOTION: Approved as a part of the Council's Regular Meeting agenda. <br /> 2. AGENDA ITEMS <br /> A. Townhome Association Drainage Analysis <br /> Public Works Director Maurer explained that this issue is under discussion because of the <br /> flooding problems that occurred during the July 16th storm. Council determined in August 2011 <br /> that it would be appropriate to ask Bolton and Menk to take a look at the hydrology of the Arden <br /> View Townhome drainage system and determine if there were any opportunities to improve that <br /> system. He explained that he toured the site with Bolton and Menk. Bolton and Menk sent a <br /> survey crew to the site, gathered some critical topographic information, then constructed an <br /> existing model of the drainage system, and calibrated that model based on data gathered from the <br /> on-site inspection. Their analysis shows that the drainage system on that property is designed for <br /> a 10 year storm event which is what the City would require a developer to construct today. But <br /> the rolling terrain and grading of the development would likely be required to be done differently <br /> today so as not to trap storm water in areas with no emergency overland outlet. Research showed <br /> that in the mid 1970's the City had accepted the storm sewer piping/ponding on this site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.