My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-11-WS Draft Minutes
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2011
>
11-14-11-R
>
10-10-11-WS Draft Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2013 5:35:13 PM
Creation date
10/28/2013 5:35:11 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> ARDEN HILLS CITY COUNCIL WORK SESSION—OCTOBER 10, 2011 4 <br /> Mr. Thomas explained that their objective is to reduce the amount coming into the system. 0 <br /> Mayor Grant asked if the water on the north end can be redirected to reduce the amount of water <br /> going into the north ponds. <br /> Mr. Thomas responded it would have to be high enough to work. Also, that would end up <br /> creating a whole new system which would result in a change to the watershed boundaries, and that <br /> would require Watershed approval. <br /> Public Works Director Maurer stated that we have to remember that we are looking at pushing <br /> a 100 year storm through a 10 year pipe. <br /> Jane Larson, Townhouse Village resident and President of the Board of Directors for the South <br /> Townhouse Association, thanked the Council for their efforts to resolve the drainage issues. She <br /> stated the whole system has to be considered. She added that there was some flood damage in the <br /> north area of the development; in the south end there were eight cars parked in townhome garages <br /> that were damaged on July 16; and there was some damage on the west side. She explained that <br /> the North Association does not see the drainage as a problem but they do get ponding in one area. <br /> She also stated that there is a way to take the drainage north; there is an area along the boundary <br /> of the North Association along a walking path to the old city hall site. To the west of the north <br /> pond there is an area that goes into another walking path which goes down into a low area. <br /> Public Works Director Maurer commented that he did not ask Bolton and Menk to look beyond • <br /> the existing system but the Council could now ask them to go back and model additional area. <br /> Councilmember Holden stated that it will probably result in costs similar to Option 4. She <br /> added that the costs will be assessed and wondered if both the North and South Associations <br /> would be assessed. <br /> City Administrator Klaers stated that 100% of these costs can be assessed because the <br /> improvement is on private property and would benefit private property. <br /> City Attorney Jerry Filla commented that even those properties at the top of a hill benefit from <br /> the drainage system. <br /> City Attorney Filla asked if the system has been televised recently. <br /> Public Works Director Maurer responded they have not televised. He added that if he felt there <br /> was a blockage anywhere,he would have,but he does not believe that was the problem. <br /> Mayor Grant asked if there is any blockage downstream. <br /> Mr. Thomas responded they are not aware of any blockage. <br /> Councilmember Tamble asked if the road construction in that area contributed to the damage <br /> that was done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.