Laserfiche WebLink
email informing System Users that the System is <br />available for use. <br />6.4.10.2.4Within two weeks of the resolution ECC will document <br /> <br />the outage and resolution, and distribute this to the <br />Operational Contacts. <br />6.4.11Test System software patches, updates and upgrades before installation. <br /> <br />6.4.12Plan for the installation of software updates and upgrades so as to minimize <br /> <br />service disruptions to System Users. <br />6.4.13Maintain the software configurations for the network security eq <br /> <br />6.4.14Be responsible for initial troubleshooting of access issues from <br /> <br />used for System access at Member sites. <br />6.4.15Be responsible for initial (first call) troubleshooting of acces <br /> <br /> <br />6.4.16Update the GIS base map (layers, centerlines, street names, etc.) at a <br /> <br />minimum quarterly. <br />6.4.17Manage user access (adds, changes, etc.), notification data, and <br /> <br />administrative information when notified by Members of such changes. <br />6.5Disaster Recovery and Continuity of Operations Services <br /> <br />6.5.1The County will provide and maintain Disaster Recovery (DR) and Continuity <br /> <br />of Operations services for functions identified in Exhibit 4, attached hereto <br />and made a part of this Agreement, in accordance with procedures <br />established by the Department in consultation with the CAD Command <br />Subcommittee. <br />6.5.2In the event of a System failure that is not resolved through bu-in <br /> <br />redundancy and resiliency, an authorized ECC manager or designee will <br />authorize a change over from the primary System to the DR system. <br />6.5.3The County will configure the System so DR services are operation <br /> <br />two (2) hours after authorization to change over from the primarSystem to <br />the DR system. <br />6.5.4The County will provide personnel trained in how to implement a <br /> <br />over from the primary System to the DR system. <br />6.6Training <br /> <br />6.6.1The County will provide and maintain a Training Environment for the System. <br /> <br />6.6.2The County will provide System User training as follows: <br /> <br />6.6.2.1Initial training of System Users prior to go-live of the new System <br /> <br />will be provided in a Train-the-Trainer mode. The County will <br />provide training and training materials to individuals designated <br />CAD and Mobile Data Agreement Ramsey County and User Members Page 23 of 48 <br /> <br />