Laserfiche WebLink
11 comments were submitted in writing at the open house. The nature of the comments consisted <br />mostly of concerns with bicycle and pedestrian access, access to TCAAP, pros and cons of <br />roundabouts in general, and the construction impacts of the interchanges. Verbal feedback was <br />generally positive about the momentum to improve the interchanges and raised concerns similar <br />to those submitted in writing. <br />The concept designs are posted on the TCAAP Master Plan page of the City’s website. <br />Next Steps <br />City Council review of the first Master Plan draft is scheduled for December 16, 2013. The next <br />TCAAP open house is tentatively scheduled for Wednesday, January 22, 2014. Master Plan <br />consultants will also ask for feedback from the JDA and the Planning Commission on January 6 <br />and 8, 2014, respectively. The final Master Plan and the draft AUAR are both expected to be <br />completed in spring 2014. <br />22 <br />Page of <br />