Laserfiche WebLink
Pedestrian access to the site and parking layout has been modified to accommodate the revised <br />building orientation. The existing parking area would be redone during Phase 1 and landscaping <br />over the entire site installed. The existing retail building itself is not proposed to be altered as <br />part of this development plan; however, it does appear to be in need of updating. Additional <br />discussion to identify a timeline for façade improvements to the existing building would be <br />appropriate at this time. <br />The City Council reviewed the proposed PUD Amendment at their May 16, work session. At the <br />meeting, the Council expressed general support for the amendment as proposed and site plan; <br />however, expressed concern over the architectural design and quality of the building. In <br />addition, the Council encouraged the developer to move forward with marketing Building 4, as a <br />future development phase. <br />Since the May 16, work session with the Council, CVS has revised their project proposal and <br />submitted updated drawings (Attachment C). They anticipate submitting a full application for a <br />PUD Amendment and Preliminary and Final Plat in time for the July 6, Planning Commission <br />meeting. <br />Discussion <br />At this time, the Planning Commission is being asked to review and provide feedback on the <br />proposed site plan revisions. As the applicant moves forward with a formal application for a <br />PUD Amendment certain aspects of the project will be reviewed in more detail, such as <br />landscaping and signage; however, those items have not yet been finalized for the purpose of this <br />meeting. <br />Staff has met with the developer and CVS Pharmacy several times over the last few months. The <br />proposed site plan has been altered since our earliest meetings to be more in line with the City’s <br />Guiding Plan for the B2 District. There are aspects of this plan that are improvements over the <br />original Master Plan. The reorientation of the building to the south is a positive change that <br />allows for better pedestrian movements into and through the site, and creates an improved <br />relationship between the buildings and the parking on site. The drive-thru and loading areas <br />have remained on the west side of the building and are screened by Building 2, which will be <br />constructed as part of Phase 1, rather than at a later unknown date, as was the case with the <br />City of Arden Hills <br />Planning Commission Meeting for June 8, 2011 <br />\\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-008 - Arden Plaza Concept Review (Pending)\06-08-11 - Arden Plaza Concept <br />Review - PC Memo.doc <br />Page 3 of 5 <br />