My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
01-13-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2014 1:08:05 PM
Creation date
1/17/2014 1:07:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Boston Scientific Corporation <br />Building 14 Mechanical Addition <br />Land Use Application Narrative <br />November 4, 2013 <br /> <br /> <br />Boston Scientific would like to request a PUD amendment for an a <br />quadrant of its Arden Hills Campus. The purpose of the addition <br />ongoing manufacturing processes in the building. <br />The proposed addition is 1,310 gross square feet, single-story. The height of the addition shall match the <br />existing adjacent roofline at approximately 22 above grade. The <br />masonry with steel joist and deck roof structure. The exterior finish will be EIFS with color and reveal <br />pattern to match existing adjacent construction. Other exterior <br />louvers and prefinished metal coping. <br />The existing landscaped area at the addition is turf grass. The area disturbed by construction will be <br />restored to its previous condition. Coniferous trees equivalent <br />will be planted in the vicinity of the addition near the west pr <br /> <br />November 14, 2013 <br />Addendum #1: Response to City Planners Comments <br />Planner request: <Please provide> a more in-depth narrative describing the use of the new addition <br />and the equipment to be installed. <br />Question: What does the equipment do? <br />The equipment will include: two new air compressors, relocation of one existing compressor (for <br />backup only), two new air dryers, two new vacuum pumps, one compressed air s <br />and one vacuum storage tank. The purpose of the equipment is to <br />and process vacuum to the manufacturing lines in the building. The compressors and pum <br />charge their respective storage tanks and the processes are supp <br />Question: How often will it run? Will it run more than the current equipment? <br />Current State: <br /> Compressors: <br />2 or 3 compressors running wide open during the day (~6:00am-~6:00pm) <br />1 compressor running wide open the rest of the time (nights and <br /> Vacuums: <br />2 vacuum pumps running wide open during the day (~6:00am-~6:00pm) <br />1 vacuum pump running wide open the rest of the time (nights and <br />weekends) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.