My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
01-13-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2014 1:08:05 PM
Creation date
1/17/2014 1:07:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AttachmentE <br /> <br />MEMORANDUM <br /> <br />3.B <br />DATE: <br />December 4, 2013 PC Agenda Item <br /> <br /> <br />TO: <br /> Planning Commission <br /> <br />FROM: <br />Matthew Bachler, Community Development Intern <br /> <br />SUBJECT: Planning Case #13-021 - This application requires a PUBLIC HEARING <br /> Applicant: <br />Boston Scientific Corporation <br />Property Location: <br /> 4100 Hamline Avenue North <br />Request: <br /> Planned Unit Development Amendment and Site Plan Review <br /> <br /> <br />Requested Action <br /> <br />The applicant has requested a Planned Unit Development Amendment and Site Plan Review to <br />construct a 1,310 square foot addition to the west side of building 14 on the Boston Scientific <br />Corporation Campus. <br /> <br />Background <br /> <br /> <br />1.Overview of Request <br /> <br />th <br />Boston Scientific is requesting a Master Plan PUD (10) Amendment and Site Plan Review to <br />construct a 1,310 square foot addition to the west side of building 14, which is located in the <br />northwest quadrant of the Boston Scientific Campus. Building 14 is also identified on the <br />campus Master Plan as Building N. The purpose of the addition is to house mechanical <br />equipment used for manufacturing. The new system is designed to improve system reliability. <br /> <br />Specific pieces of equipment would include three air compressors, two air dryers, two vacuum <br />pumps, one compressed air storage tank, and one vacuum storage tank. Upon completion of the <br />addition, Boston Scientific will discontinue the use of three pieces of equipment (two vacuum <br />pumps and an air compressor) in the existing mechanical room on the north side of Building 14. <br />One piece of equipment (an air compressor) will be relocated and used in the new addition. <br /> <br />The single story addition would match the existing adjacent roofline at approximately 22 feet <br />above grade. The structure of the building will be concrete masonry with steel joists and a deck <br /> <br />City of Arden Hills <br />Planning Commission Meeting for December 4, 2013 <br />P:\Planning\Planning Cases\2013\PC 13-021 - PUD Amendment - Boston Scientific\Memos_Reports_13-021 <br /> <br />Page 1 of 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.