Laserfiche WebLink
And we thought winter and road construction could not exist toge <br />by Dave McClung <br />M <br />ost years road construction time, the ramp from Hamline Avenue to <br />season ends and winter season westbound US Highway 10 opened with <br />appears just days later. This at Hamline Avenue and County Road F and <br />year, winter came too early. Construcends (early, we hope) and construction <br />- <br />tion crews that have been working in and quadrant of that intersection. At the same ramps up again, crews will be back in this <br />around Arden Hills for two years area to complete landscaping. <br />road construction projects before <br />Father Winter blew in with ice, after a full construction season, <br />snow, and very cold weather. The but MnDOT tells us that some <br />most noticeable overlap of sea <br />- <br />sons was seen at the intersection when the next construction sea <br />- <br />of US Highway 10 and County <br />son starts. <br />Road 96. <br />When County and City snow <br />Left: Westbound Highway 96 at <br />- <br />US Highway 10 bridge. <br />fall of the winter season, they <br />had to dodge orange construc <br />- <br />tion barrels on County Road 96. <br />Construction crews ran out of <br />time to complete the sound wall <br />on the north side of County Road <br />96 (along Arden Manor Manufactured <br />at the two intersections of County Road <br />96 and Old Highway 10 and Round Lake <br />Right: Eastbound Highway 96 <br />Road. The orange barrels stayed in place <br />at Round Lake Road <br />for a couple of weeks with snow piling <br />intersection <br />up until crews could complete some work <br />that needed to be done this year. <br />On December 18, MnDOT emailed its <br />regular project update and announced that <br />County Road 96 was open to two lanes of <br />Goodwill store proposed for Arden Hills <br />by Susan Cathey <br />Avenue and the I-35W bridge. MnDOT <br />A A proposal has been submitted to the Proceeds from Goodwill’s retail stores <br />A <br />advised that some work would continue <br />A provide the main funding for the organi <br />City of Arden Hills by the Davidson <br />A <br />- <br />Corporation for the construction and lease <br />zation’s career training and counseling zation’s career training and counseling <br />signals may not be functional until later <br />of a building at the corner of Lexington program worldwide. Because the success <br />this winter or spring, depending on the <br />Avenue and County Road E to Goodwill of the stores is primarily based on receiv <br />weather. Barrels can still be seen at the <br />- <br />Industries. The proposed project is a one-ing high quality donated goods for resale <br />sides of the road because the curbing is <br />story, approximately 17,000 square foot at the same location, Goodwill’s goal is to <br />building to be used as a Goodwill store. locate their new stores in desirable com <br />spring. <br />- <br />munities such as Arden Hills. <br />The building would <br />County Road 96 has now been totally <br />include an inside The proposal for this devel <br />rebuilt from Highway 61 in White Bear <br />- <br />drop-off area on the opment was scheduled to <br />Lake to the Round Lake Road intersec <br />- <br />north side, as well as two docking areas go to the Arden Hills Planning Commis <br />tion. Only a couple hundred feet of <br />- <br />for a semi-trailer and a trash compactor sion on January 8 and would tentatively <br />reconstruction remain. The County Road <br />located behind the building and screened be considered by the City Council at its <br />96 bridge across I -35W is scheduled to <br />from view. Plans call for trees, shrubs and meeting on January 27. <br />the total reconstruction. <br />particularly along the Lexington Avenue <br />side and the border with e-Street Flats. <br />4 <br />