My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-06-13 EDC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
2013
>
11-06-13 EDC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 9:05:01 AM
Creation date
1/28/2014 9:04:53 AM
Metadata
Fields
Template:
General
Document
11-6-13 EDC Packet
General - Type
11-6-13 EDC Packet
Category
11-6-13 EDC Packet
Date
11/6/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
http://www.twincities.com/ramseycounty/ci_24389797/if-pollution- <br />"It's cleanup to residential standards, which is the highest sta <br />plenty for anybody wanting to do development. Developers want a <br />MPCA (Minnesota Pollution Control Agency). If they end up with t <br />cleanup sites are safer than (typical development sites) ... bec <br />KEY TAXPAYER PROTECTIONS <br />Ramsey County's agreement with the federal government includes a <br />enough to fully cover the cost of building demolition and enviro <br />million contract with Bolander will be deducted from the purchas <br />costs are projected to be $4.9 million. <br />What's more, officials say the agreement with Bolander is fixed- <br />increase even if the extent of cleanup is greater than expected. <br />County Commissioner Victoria Reinhardt, who initially voted agai <br />isn't worried about cost overruns. <br />"Our liability from a dollar standpoint is capped in the contrac <br />something they didn't anticipate and it costs a lot more, then t <br />government. That's not on us." <br />While finding something unexpected is a distinct possibility, Re <br />thorough vetting from Bolander and a rival bidder, Veit Contract <br />"It was in the contractor's best interest before agreeing to a c <br />possibly could before putting out that bid," she said. "Otherwis <br />the federal government and the feds say 'you should have known.' <br />As further backup, the county also took out an environmental ins <br />'EVERYTHING THAT'S KNOWN IS ON US' <br />"The contract is written as such that everything that's known is <br />Bolander's environmental consultant, Wenck Associates of Maple P <br />something that's new, then the Army has to respond. ... We've re <br />was wrapped in asbestos. We're not seeing much other than pretty <br />haven't been ugly surprises." <br />One building "had a horrible amount of asbestos on the walls," O <br />wall. There were PCBs on the equipment in the building, and it t <br />building. So we've got a real cleanup to do there. It's a five-t <br />problem, and we will solve it. The good news about PCBs is they <br />"This piece of real estate, these four square miles, have been a <br />Minnesota," Otte said. "The most significant problem is the one <br />namely this groundwater plume. <br />Page 3 of 5Nov 01, 2013 03:23:12PM MDT <br />
The URL can be used to link to this page
Your browser does not support the video tag.