Laserfiche WebLink
Proposed Trails <br />Priority Listings <br />Trail Location <br />LengthLength <br />Segment <br />FeetMiles <br />HIGH PRIORITY <br />C2,956.800.56 <br />New Brighton Road (County Rd. D to Stowe Ave.) <br />C.15,332.801.01 <br />New Brighton Road (Stowe Ave. to County Road E2) <br />E1251.570.24 <br />Lake Valentine Road (from segment E.1 path to bridge) <br />G2787.150.53 <br />County Road E (Indian Pl. to Lk. Joh. Blvd. to Tony Schmidt U. Trail to end of park - north side) <br />G.11,742.400.33 <br />Lake Johanna Blvd. (From Segment G to Old 10 - Snelling) <br />H2,184.840.41 <br />County Road E (Old 10-Snelling to Connelly Ave.) <br />I4,382.400.83 <br />Snelling Ave. (Highway 51 to County Road E) <br />I.11,056.000.20 <br />Old Highway 10-Snelling (Cty Road E through CP Rail) <br />I.22,270.000.43 <br />Old Highway 10-Snelling (from CP Rail to County Rd. E2) <br />I.38,870.001.68 <br />Old Highway 10-Snelling (from Cty. Road E2 to Hwy. 96) <br />J2,258.400.43 <br />Lake Valentine Road (Mounds View H.S. to Old 10-Snelling) <br />L3,941.460.75 <br />County Road 96 (Hamline Ave. To North Heights (North side) <br />O3,383.000.64 <br />Lexington Ave. (From County Road F to Grey Fox Road) <br />MEDIUM PRIORITY <br />D.1670.910.13 <br />County Road E2 (Cleveland Ave. to New Brighton Rd.) <br />E.12,871.000.54 <br />R.C. Open Space (from segment E path to MVHS) <br />Q1,372.800.26 <br />Highway 51 (From Old Hwy. 10/Snelling to just past Glenhill Rd) <br />LOW PRIORITY <br />A2,623.310.5 <br />Cleveland Ave. (County Road "D" to Stowe Ave.) <br />A.21,671.900.32 <br />Cleveland Ave. (Thom Ct. to existing path off Cty E2) <br />B2,644.360.5 <br />County Road D (Cleveland to New Brighton Road) <br />K2,395.210.45 <br />Parkshore Dr. (from Old Hwy 10-Snelling to beginning of Rd. Lake Trail) <br />K12,164.800.41 <br />Gateway Blvd. (from proposed segment K to Round Lk. Road) <br />K22,421.310.46 <br />Round Lake Trail (Complete the loop that has a gap behind Deluxe Corp.) <br />K32,633.740.5 <br />Round Lake Road W. (from Gateway Blvd. to existing trail off of 96) <br />M2,826.820.54 <br />North Snelling Ave. (From County Road 96 to Briarknoll) <br />O.15,211.700.99 <br />Lexington Ave. (From County Road E to Shoreline Lane) <br />O.27,889.601.50 <br />Lexington Ave. (From Tanglewood to County Road I - West Side) <br />P838.190.16 <br />Crepeau Preserve (From Cannon to Crepeau Nature Preserve) <br />P.11,266.210.24 <br />Pine Tree Drive(From Cty Road E to existing grass trail into Crepeau) <br />R1,237.000.23 <br />County Road E - (From Lexington to existing Concrete Sidewalk) <br />Total Future Trails81,904.1115.53 <br />Part or whole segment has tentatively been designated to be built in <br />near future with road projects or development. <br />Trails are listed in alphabetical order within each priority category <br /> and it does not reflect priority within the category. <br />Updated in December, 2013 <br />