My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-04-13 PC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2013
>
12-04-13 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2014 10:41:01 AM
Creation date
3/5/2014 10:40:59 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION December 4, 20136 <br /> <br />the addition is to house mechanical equipment used for manufacturing. The new system is <br />designed to improve system reliability. <br /> <br />Community Development Intern Bachler <br /> explained that specific pieces of equipment would <br />include three air compressors, two air dryers, two vacuum pumps, one compressed air storage <br />tank, and one vacuum storage tank. Upon completion of the addition, Boston Scientific will <br />discontinue the use of three pieces of equipment (two vacuum pumps and an air compressor) in <br />the existing mechanical room on the north side of Building 14. One piece of equipment (an air <br />compressor) will be relocated and used in the new addition. <br /> <br />Community Development Intern Bachler <br /> indicated the single story addition would match the <br />existing adjacent roofline at approximately 22 feet above grade. The structure of the building will <br />be concrete masonry with steel joists and a deck roof structure. EIFS with color and reveal <br />pattern to match the existing construction will be used as the principal exterior finish. Other <br />exterior materials will include prefinished metal building vents and wall capping. <br /> <br />Community Development Intern Bachler <br /> commented that the existing landscaped area where <br />the addition will be constructed is turf grass. All areas disturbed by the construction will be <br />requirements will be planted in the vicinity of the addition near the western property line. <br /> <br />Site Data <br />Future Land Use Plan: Light Industrial and Office <br />Existing Land Use: Light Industrial and Office <br />Zoning: I-1: Limited Industrial / PUD Overlay <br />Size: 92.8 acres <br />Proposed Density: N/A <br />Topography: Level <br /> <br />Community Development Intern Bachler <br /> reviewed the surrounding area, past Planning Cases <br />for Boston Scientific and the Plan Review. <br /> <br />Community Development Intern Bachler <br /> explained the Planning Commission must make a <br />finding as to whether or not the proposed PUD Amendment and Site Plan Review at 4100 <br />Hamline Avenue North would adversely affect the surrounding neighborhood or the community <br />as a whole based on the aforementioned factors. Staff offers the following eight (8) findings of <br />fact for consideration: <br /> <br />1. A Master PUD was approved for 4100 Hamline Avenue North in Planning Case #02-025. <br />2. The proposed 1,310 square foot addition to Building 14 was not included in the approved <br />Master PUD and an amendment to the PUD is therefore required. <br />3. The Master PUD requires that a Site Plan Review be applied for prior to the construction <br />of any building or addition. <br />4. The property is located in the I-1: Limited Industrial District. <br />5. The proposal is in substantial conformance with the zoning and design standard <br />requirements for the I-1: Limited Industrial District. <br />6. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.