My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-14 PC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2014
>
01-08-14 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2014 10:44:03 AM
Creation date
3/5/2014 10:43:59 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION January 8, 201410 <br /> <br />17. Roof-mounted mechanical equipment shall be completely screened from the ground-level <br />view of adjacent properties and public streets. <br />18. The property owner shall coordinate with the City to ensure that any plantings in the <br />gateway sign ease <br />19. No semi-trailer trucks shall enter or exit the site between the hours of 6:00 A.M. and <br />10:00 P.M. <br />20. For twelve (12) months following the issuance of the Certificate of Occupancy, the <br />owner/developer may operate without regard to the condition regarding hour restrictions <br />for truck operations (Condition #19). At the end of that period, the City at its discretion <br />may in writing extend the exception to the restriction, allow it to expire, or process a <br />permanent amendment to the PUD. <br />21. Any future subdivision of the property at 1201 County Road E shall be conditioned on the <br />prohibition of direct access to Lexington Avenue or new access to County Road E. The <br />existing County Road E access may be relocated with City and County approval. <br />22. The metal screen and gate around the loading area shall be light tan to match the color of <br />the brick used on the building façade. <br />23. On-site way finding signage shall be installed to clearly identify the donation drop-off <br />location. <br />24. The four (4) dashed parking spaces as shown on the AS100 Site Plan shall be removed in <br />order to accommodate truck maneuvering on site and access to the loading area. <br /> <br />Associate Planner Bachler <br /> reviewed the options available to the Planning Commission on this <br />matter: <br /> <br />1. Recommend Approval with Conditions. <br />2. Recommend Approval as Submitted. <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Larson <br /> opened the floor to Commissioner comments. <br /> <br />Commissioner Holewa <br /> asked if a Rice Creek Watershed permit would be required for this <br />project. <br /> <br />Associate Planner Bachler <br /> stated that the property currently has a permit from Rice Creek <br />Watershed from the E Street Flats project. He noted this permit was still open and there would <br />be no need for the applicant to apply for another permit. <br /> <br />Commissioner Holewa <br /> <br />comments were addressed by the applicant. <br /> <br />Associate Planner Bachler <br /> explained that he and the City Engineer would be responsible for <br />ensuring all comments were addressed. <br /> <br />Commissioner Holewa <br /> asked if all of the B-2 District Design Standards were met. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.