Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—FEBRUARY 10, 2014 10 <br /> feet. He explained that an Xcel lighting system would provide the City a lower up-front cost, but <br /> would come with a flat rate for maintenance over the next 25 years. He indicated that the Xcel <br /> lighting schematics would have the lights placed every 200 feet along the corridor. It was his <br /> opinion that there would be an aesthetic difference between the lighting if spaced between 100 <br /> feet and 200 feet. He stated that this corridor was a unique system in which the City owns the <br /> lights along the County roadway. <br /> Councilmember Holmes stated that she still did not understand why the lighting expense was so <br /> high. She wanted to see the lighting expense reduced by 50%. <br /> Mayor Grant questioned how the lights were currently spaced. <br /> Mr. Thomas stated that the lights were spread quite far at this time, around 200 hundred feet <br /> apart. <br /> Mayor Grant was in favor of reducing the lighting expense. <br /> Councilmember McClung stated it would be difficult for the Council to determine a proper <br /> amount for the lighting from the bench this evening. Instead, the Council would have to <br /> determine what look and feel was appropriate for the corridor. <br /> Mr. Thomas stated that he could provide the Council with estimated illumination amounts based <br /> on proposed lighting plans. <br /> Councilmember McClung reported that he was not able to support the feasibility report until the <br /> lighting concerns were further addressed. <br /> Councilmember Holmes agreed stating she could not approve the plan until she had further <br /> information to make an educated decision. <br /> Councilmember Holden expressed concern with the traffic congestion with vehicles trying to <br /> make a left hand turn from County Road E to Lexington Avenue. She then requested further <br /> information regarding the improvements proposed for Connelly Street. <br /> Mr. Thomas reviewed the configuration of this roadway in further detail with the Council. <br /> Mayor Grant noted that the feasibility report discussed decorative medians where appropriate. <br /> He questioned where these would be placed within the plan. <br /> Mr. Thomas provided the Council information on the proposed decorative medians explaining <br /> that they could have colored concrete all the way through. <br /> Mayor Grant asked if the Council had time to further review the lighting options. <br /> Mr. Thomas stated this would not be a concern as the City was still working to acquire <br /> easements. <br />