Laserfiche WebLink
Figures in Appendix: <br />Figure T1 – Project Location Map <br />Figure T2 – Site Plan with Access Roads and Regional Access Roadway System <br />Figure T3 – Proposed CR H and I-35W Interchange <br />Figure T4 – Existing Roadway Geometry <br />Figure T5 – 2030 No Build Roadway Geometry <br />Figure T6 – 2030 Baseline Roadway Geometry <br />Figure T7 – 2030 Minimum Development Scenario Roadway Mitigation Geometry <br />Figure T8 – 2030 Maximum Development Scenario Roadway Mitigation Geometry <br />Figure T9 – Existing Traffic <br />Figure T10 – 2030 No Build Traffic <br />Figure T11 – 2030 Baseline Geometry Site Distribution <br />Figure T12 – 2030 Minimum Development Scenario Mitigated Site Distribution <br />Figure T13 – 2030 Maximum Development Scenario Mitigated Site Distribution <br />Figure T14 – 2030 Minimum Development Scenario Site Traffic (Baseline Distribution) <br />Figure T15 – 2030 Minimum Development Scenario Total Traffic (Baseline Distribution) <br />Figure T16 – 2030 Maximum Development Scenario Site Traffic (Baseline Distribution) <br />Figure T17 – 2030 Maximum Development Scenario Total Traffic (Baseline Distribution) <br />Figure T18 – 2030 Minimum Development Scenario Site Traffic (Mitigated Distribution) <br />Figure T19 – 2030 Minimum Development Scenario Total Traffic (Mitigated Distribution) <br />Figure T20 – 2030 Maximum Development Scenario Site Traffic (Mitigated Distribution) <br />Figure T21 – 2030 Maximum Development Scenario Total Traffic (Mitigated Distribution) <br />TCAAP Traffic Analysis <br />Technical Memorandum21March 2014 <br />