Laserfiche WebLink
<br />DRAFT MITIGATION PLAN <br />This Mitigation Plan is submitted as part of the Draft AUAR to p <br />understanding of the actions which are advisable, recommended, o <br />minimize potential impacts by the proposed development scenarios <br />updated based on comments received during the Draft AUAR comment period. <br />This Mitigation Plan is intended to satisfy the AUAR rules that <br />specifies measures or procedures that will be used to avoid, min <br />development within the AUAR study area. Although mitigation stra <br />document, this plan will be formally adopted by the RGU as their <br />environmental impacts. <br />The primary mechanism for mitigation of environmental impacts is <br />regulations. The plan does not modify the regulatory agencies re <br />regulatory programs, nor create additional regulatory requiremenitigation Plan specifies the legal and <br />institutional arrangements that will assure that the adopted mit <br />There were no impacts identified in Sections 9, 10, 14, 15, 16, <br />mitigation and are not included in the Draft Mitigation Plan. Th <br />requirements and/or mitigation measures that reduce the level of <br />area. The plan is formatted consistent with the sections of the <br /> <br /> <br /> <br />April 2014 Draft 1 <br />