My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-28-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
04-28-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2014 4:01:55 PM
Creation date
4/25/2014 4:01:00 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City has been working with Egan, Field & Nowak (EFN), Inc. to replat thearea so that <br />concerns with adequate right-of-way areas and drainage andutility easement areas are addressed <br />before the City commences the reconstruction work of Round Lake Road and Gateway Court in <br />2014. The replat of this property will allow the City to acquireadditional right-of-way along <br />Round Lake Roadand Gateway Court, while vacating a portion of the right-of-way that is within <br />the parking lot of 1987Gateway Boulevard. In addition, the replat of this area will allow the <br />City to obtain crucial drainage and utility easements neededfor maintenance purposes and at the <br />same time vacateportions that are nolonger needed by the City.The City Council will review <br />the right-of-way and easement vacation request at the time of the Final Plat review. <br />The Public Works Director has provided a memo detailing the project in Attachment A.The <br />PreliminaryandFinal Plat has also been provided in Attachment B. <br />Plan Evaluation <br />1.G-BRegulations, Existing Conditions, and Proposed Development <br />A.Lot Coverage: <br />Meets Requirements <br />The plat should not impact lot coverage requirements or create additional <br />nonconformities. <br />2.Subdivision Ordinance <br />A.Street Access and Utilities (1130.03 & 1140.05) <br />No new streets are being created as a result of this plat. Minimum roadway widths <br />will be maintainedand are shown on the Final Plat. Commercial and industrial <br />roadways require a minimum width of 70 feet with a pavement width of 36 feet. Cul- <br />de-sacs require a minimum width of 60 feet with a pavement width of 28 feet. <br />Utilities are required to be installed underground as stated in the Code. <br />The City will acquire additional right-of-way along Round Lake Road and Gateway <br />Court, while vacating a portion of the right-of-way that is within the parking lot of <br />1987 Gateway Boulevard. <br />B.Easements (Section 1130.05 & 1130.08) <br />City subdivision regulations require twelve (12) foot wide drainage and utility <br />easements dedicated to the City along the right-of-way and centered on common lot <br />City of Arden Hills <br />City Council Meeting for April 28,2014 <br />P:\Planning\Planning Cases\2014\PC 14-013 -Round Lake Road_Gateway Court -Preliminary, Final Plat and Roadway & Easement <br />Vacation\Preliminary &Final Plat\Memos_Reports_14-013 <br />Page 2of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.