My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
05-27-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2014 4:05:58 PM
Creation date
5/23/2014 4:05:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AttachmentE <br />MEMORANDUM <br />3.B <br />DATE: <br />May 7, 2014PC Agenda Item <br />TO: <br />Planning Commission <br />FROM: <br />Matthew Bachler, Associate Planner <br />SUBJECT:Planning Case #14-015-This application requires a Public Hearing <br />Applicant: <br />Boston Scientific Corporation <br />Property Location: <br />4100 Hamline Avenue North <br />Request: <br />Planned Unit Development Amendment and Site Plan Review <br />Requested Action <br />The applicant has requested a Planned Unit Development Amendment and Site Plan Review to <br />construct a 730square foot addition on the south side of Building 10 ontheBoston Scientific <br />Corporation Campus. <br />Background <br />1.Overview of Request <br />th <br />Boston Scientific is requestinga Master PUD (11)Amendment and Site Plan Review to <br />construct a 730 gross square foot addition on the south side of Building 10, which is located in <br />the south central portion of the Boston Scientific Campus.Building 10is also identifiedon the <br />campus Master Planas Building D.The purpose of the addition is to provide storage and support <br />for ongoing product development and research. <br />The addition wouldinfill an existing paved courtyard and would match the adjacent roofline at <br />approximately 13feet above grade.The structure of the building wouldbe concrete masonry <br />with a steel beam and deck roof structure.The exterior finish will be face brick with color and <br />coursing to match the existing construction. <br />The existing landscaped area where the addition will be constructed is turf grasswith a mix of <br />mature trees. All areas disturbed by the construction will be restored to their previouscondition. <br />Building 10 is heavily screened from the south by a wooded wetland area located between the <br />City of Arden Hills <br />Planning Commission Meeting for May 7, 2014 <br />P:\Planning\Planning Cases\2014\PC 14-015 -Boston Scientific -PUD Amendment -Building Addition\Memos and <br />Reports_14-015 <br />Page 1of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.