Laserfiche WebLink
CONSENT ITEM 5F <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: May 27, 2014 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />Patrick Klaers, City Administrator <br /> <br />FROM: John Anderson, Assistant City Engineer <br /> <br />SUBJECT: Xcel Energy Contract Lighting Installation <br />Round Lake Road/Gateway Boulevard <br /> <br /> <br />Requested Action <br /> <br />Authorize the execution of the contract with Xcel Energy for the installation of 31-30 foot poles <br />with 150W Cobra Cutoff Fixtures for Round Lake Road and Gateway Boulevard. <br /> <br />Background/Discussion <br /> <br />As part of the Round Lake Road Area improvement project it was proposed to install street <br />lighting through Xcel Energy. Originally, the Feasibility Report proposed lighting only along <br />the east side of Round Lake Road as that is where the pedestrian facility will be built. However, <br />at the Public Hearing a business owner asked the Council to consider lighting Gateway <br />Boulevard also. The Council gave this direction to staff after the Public Hearing. <br /> <br />Attached is the contract for the installation of the lights by Xcel Energy. The total cost for <br />installation is $120,481.40. After installation the monthly cost for energy and maintenance of <br />the lights is $6.94 per light. <br /> <br />Attachment <br /> <br /> <br />Xcel Energy contract for light installation <br /> <br />11 <br />Page of <br /> <br />