An operations analysis was conducted for the 14 intersections in the analysis area to determine current
<br />operational issues within the AUAR study area. Current volumes were obtained from the Draft TCAAP
<br />Redevelopment Traffic Study, performed by SEH dated August 29, 2007. All existing conditions geometrics
<br />for this analysis were based on field verified existing intersection geometrics.
<br />Trip Generation
<br />A summary of the Minimum and Maximum Development Scenario trip generation calculations for the AM
<br />and PM peak hours are shown inTable 18-3 andTable 18-4.
<br />Table 18-3. Minimum Development Scenario Trip Generation
<br />TotalAM
<br />Units / KAMAMPM TripsPM TripsPM
<br />UseDailyTrips
<br />sq. ft.Trips InTripsInOutTrips
<br />TripsOut
<br />Residential1,500 11,0502106508606604051,065
<br />Retail500 21,3503001804808909651,855
<br />Non-retail
<br />1,700 16,4801,9952802,2753701,8152,185
<br />Commercial
<br />Total 48,8802,5051,1103,6151,9203,1855,105
<br />15% Transit and Multi-
<br />41,5502,1309453,0751,6302,7104,340
<br />use Reduction Factor
<br />Table 18-4. Maximum Development Scenario Trip Generation
<br />TotalAM
<br />Units / KAMAMPM TripsPM TripsPM
<br />UseDailyTrips
<br />sq. ft.Trips InTripsInOutTrips
<br />TripsOut
<br />Residential2,500 18,3953501,0851,4351,1006751,775
<br />Retail550 23,4853252005259801,0602,040
<br />Non-retail
<br />1,950 18,2852,1953052,5004152,0102,425
<br />Commercial
<br />Total 60,1652,8701,5904,4602,4953,7456,240
<br />15% Transit and Multi-
<br />51,1402,4401,3503,7902,1203,1855,305
<br />use Reduction Factor
<br />Trip Distribution
<br />The anticipated directional trip distribution for site users is provided in the Traffic Impact Analysis report
<br />included asAppendixCD.
<br />Transit
<br />Transit service exists in areas adjacent the project area, and two park and ride lots exist along CR H. As the
<br />project evolves, Metro Transit will be engaged to evaluate potential transit route changes, and to potentially
<br />consider the addition of park and ride lots within the project area.
<br />June 2014– Final AUAR28