My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-30-14-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2014
>
06-30-14-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 11:43:29 AM
Creation date
7/2/2014 11:42:49 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION APRIL 21, 201412 <br /> <br />There have been illustrative drawings showing how a regional storm water feature can be an <br />amenity to the area providing passive recreational opportunities. But thus far there has been very <br />little discussion with the Council about what their goals are for making this regional storm water <br />feature a real amenity to the site and the City. The purpose of this agenda item is to begin this goal <br />discussion. <br /> <br />Public Works Director Maurer <br /> commented that before a real goal discussion can be conducted <br />it is important to provide some detail regarding the various Federal, State and Regional agencies <br />that may have jurisdiction over at least a portion of the things happening in the blue/green spine <br />area. The first of these items is wetlands. <br /> <br />Public Works Director Maurer <br /> noted that as discussed in the AUAR, there are 14.4 acres of <br />wetlands on the TCAAP site. The largest single wetland, and possibly the most undisturbed <br />wetland, is within the blue/green spine. It is a type 2/3 wetland approximately 4 acres in size. <br />Examples of typical type 2 and 3 wetlands from the RCWD website are attached to the staff <br />memo. This type of wetland generally does not have standing water but can be flooded seasonally. <br />It is generally saturated ground a few inches below the surface. Vegetation is typically grasses, <br />sedges and rushes. <br /> <br />Public Works Director Maurer <br /> reported that there are two agencies that could have jurisdiction <br />over each wetland. The first is the Army Corps of Engineers (COE) that has authority if the <br />navigable water. The second agency is the State Wetland Conservation Act (WCA) which is <br />administrated by RCWD as the Local Government Unit (LGU). A Technical Evaluation Panel <br />require what is called sequencing whereby the applicant must show efforts to avoid, minimize, <br />rectify, reduce and replace in that order. So even if the County tries to remove all wetlands from <br />TCAAP (most of the 14.4 acres are degraded areas), the final say on what happens to the 4 acre <br />wetland in the blue/green spine rests with possibly the COE and WCA. <br /> <br />Public Works Director Maurer <br /> indicated that the next agency that will have say over how the <br />blue/green spine looks and operates is the Rice Creek Watershed District (RCWD). They are the <br />agency responsible for storm water runoff quality, volume control, and runoff rate control. <br />Generally the RCWD water quality requirement is to provide storage for 1.1 inches of rainfall <br />over the impervious area of the entire site. This will result in a fairly large volume of water; <br />approximately 20 acre-feet of infiltration area or 40 acre-feet of ponding. In addition, as detailed <br />in the AUAR, the rate control requirement imposed by RCWD for TCAAP will be 80% of the <br />predevelopment peak runoff rate. This again will result in a significant amount of ponding to <br />detain the runoff and meter it out at the maximum allowable rate (the actual maximum rate will <br />depend on what RCWD determines is the pre-existing condition). As much as possible these <br />ponding and quality control requirements are expected to be met utilizing the blue/green spine <br />area (actual calculations for these requirements are part of the City/County RFP). <br /> <br />Public Works Director Maurer <br /> stated that as part of our new MS4 permit, the City will be <br />required to come up with policies and regulations for storm water management dealing with Total <br />Phosphorus and Total Suspended Solids in the runoff stream (RCWD will be doing the same). <br />These requirements could possibly be more restrictive than the current RCWD regulations. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.