Laserfiche WebLink
Figures in Appendix: <br />Figure T1 Project Location Map <br />Figure T2 Site Plan with Access Roads and Regional Access Roadway System <br />Figure T3 Proposed CR H and I-35W Interchange <br />Figure T4 Existing Roadway Geometry <br />Figure T5 2030 No Build Roadway Geometry <br />Figure T6 2030 Baseline Roadway Geometry <br />Figure T7 2030 Minimum Development Scenario Roadway Mitigation Geometry <br />Figure T8 2030 Maximum Development Scenario Roadway Mitigation Geometry <br />Figure T9 Existing Traffic <br />Figure T10 2030 No Build Traffic <br />Figure T11 2030 Baseline Geometry Site Distribution <br />Figure T12 2030 Minimum Development Scenario Mitigated Site Distribution <br />Figure T13 2030 Maximum Development Scenario Mitigated Site Distribution <br />Figure T14 2030 Minimum Development Scenario Site Traffic (Baseline Distribution) <br />Figure T15 2030 Minimum Development Scenario Total Traffic (Baseline Distribution) <br />Figure T16 2030 Maximum Development Scenario Site Traffic (Baseline Distribution) <br />Figure T17 2030 Maximum Development Scenario Total Traffic (Baseline Distribution) <br />Figure T18 2030 Minimum Development Scenario Site Traffic (Mitigated Distribution) <br />Figure T19 2030 Minimum Development Scenario Total Traffic (Mitigated Distribution) <br />Figure T20 2030 Maximum Development Scenario Site Traffic (Mitigated Distribution) <br />Figure T21 2030 Maximum Development Scenario Total Traffic (Mitigated Distribution) <br /> <br />TCAAP Traffic Analysis <br />Technical Memorandum 22 March 2014 <br />